Advertisement

Quick Links

T/QEK AIKCKAff AG-5B SERIES
N.UUNTENANCE~AL
Table S-03
INSPECTION PROCEDURE GUIDELINE
TIQEK
~IKtKAfT
MODEL AG-SB
ANNUAL OR 100- HOUR INSPECTION PROCEDURE
ANNUAL OR 100- HOUR INSPECTION PROCEDURE GUIDELINE
FAR 43.15 (c) (1) states: "Each person performing an annual or 100- hour inspection shall use
a check list while performing the inspection. The check list may be of the person's own design,
one provided by the manufacturer of the equipment being inspected, or one obtained from an-
other source. This check list must include the scope and detail of the items contained in appen-
dix D to this part and paragraph
(b)
of this section." The following pages contain a comprehen-
sive annual or 100 - hour inspection procedure check list.
OWNER'S NAME
STREET ADDRESS
CITY
STATE
ZIP CODE
REGISTRATION NO.
SERIAL NO.
AIRFRAME HOURS
DATE INSPECTION COMPLETED
SERVICING AGENCY
CITY
REPAIR STATION No.
(if
applicable)
Check for conformity with
FAA
Specifications, Airworthiness
Directives and Tiger Aircraft Service Bulletins and Letters.
NOTE
It
is recommended that reference be made to the applicable
maintenance handbook, service bulletins, letters, installation
instructions, and vendor specifications for torque values,
clearances, settings, tolerances and other specification data.
STATE
Chapter 5
Page 5-11
Rev. 08/08/05

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AG-5B Series and is the answer not in the manual?

Questions and answers

Table of Contents