Level 2 Repair
7-1-2. Assembly
1
1) Assemble I/F SUS and PBA
3
Assemble SCREW
1) Drive Screws (5 Points)
torque 1.5 ± 0.1 Kgf/㎠ , size: 1.6 x 4.0
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung's written authorization is strictly prohibited.
2
Assemble BATTERY
Guide line
Upper right
corner
1) Assemble BATTERY in Front Ass'y
Assemble Connector
4
1) Attach FPCB connector (3 point)
2) Be careful not to scratch FPCB
7-3