BEFORE YOU START Owner's Manual Prior to installation, it is important that you contact your local government authority to determine if building approval is required. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable.
PLAN AHEAD Site Selection Avoid overhanging trees as much as possible as leaves will make regular cleaning necessary and broken branches are a potential hazard. Small trees,bushes or fences nearby can be helpful,acting as a wind break. Site Preparation The site must be prepared so that the base of the shed is level all round and checking with a spirit level is required.
Page 12
STEP 5 F1 X4 STEP 6 When diagonal measurements are 、 equal,the frame is square. The Floor Frame must be 、 BOTH square AND level or the holes will not line up properly.
Page 13
STEP 7 Pay attention to dumping Need a person or a shelf to support. Connect the wall panel to component 4R and the foundation first. F1 X5 S3 X5 STEP 8 S3 X2 F1 X2...
Page 14
STEP 9 F1 X2 S3 X2 STEP 10 Pay attention to dumping Need a person or a shelf to support. S3 X2 F1 X2...
Page 15
STEP 11 F1 X2 S3 X2 STEP 12 F1 X2 S3 X2...
Page 16
STEP 13 Pay attention to dumping Need a person or a shelf to support. F1 X2 S3 X2 STEP 14 F1 X2 S3 X2...
Page 17
STEP 15 F1 X2 S3 X2 STEP 16 Pay attention to dumping Need a person or a shelf to support. F1 X2 S3 X2...
Page 18
STEP 17 F1 X2 S3 X2 STEP 18 F1 X2 S3 X2...
Page 19
STEP 19 Pay attention to dumping Need a person or a shelf to support. F1 X2 S3 X2 STEP 20 F1 X2 S3 X2...
Page 20
STEP 21 F1 X2 S3 X2 STEP 22 Pay attention to dumping Need a person or a shelf to support. F1 X2 S3 X2...
Page 21
STEP 23 F1 X2 S3 X2 STEP 24 F1 X2 S3 X2...
Page 22
STEP 25 Pay attention to dumping Need a person or a shelf to support. F1 X2 S3 X2 STEP 26 F1 X2 S3 X2...
Page 23
STEP 27 F1 X3 S3 X3 STEP 28 The faces of the multiple holes are placed on the same side and face up when installed. F1 X4 S3 X4...
Page 24
STEP 29 F1 X12 S3 X12 STEP 30 F1 X12 S3 X12...
Page 25
STEP 31 F1 X30 S3 X30 STEP 32 F1 X30 S3 X30...
Page 26
STEP 33 F1 X30 S3 X30 STEP 34 F1 X24 S3 X24...
Page 27
STEP 35 F2 X12 S3 X12 STEP 36 Pay attention to the orientation of the ventilation window blades. F2 X8 S3 X8...
Page 28
STEP 37 When fixing the porous position, a screw can be used to pass through an accessory first, and then you can use the screw to find the hole position. F1 X8 S3 X8 STEP 38 7L&7R F1 X8 S3 X8...
Page 29
STEP 39 Need a ladder to assist with installation. 16-1 F2 X2 STEP 40 Ⅱ Ⅱ Ⅰ Ⅰ Ⅱ Ⅰ F2 X8...
Need help?
Do you have a question about the T-PS22-0108A-BN and is the answer not in the manual?
Questions and answers