Download Print this page

Neomeris Softwater RS Installation Instructions And Operation Manual

Advertisement

Quick Links

Page 1 of 8
NEOMERIS Softwater RS
Installation instruction and operation manual
Gebr. Heyl Vertriebsgesellschaft für innovative Wasseraufbereitung mbH I Max-Planck-Straße 16 I D- 31135 Hildesheim
Phone: +49 (0) 5121 7609-0 I Fax: +49 (0)5121 7609-44 www.heylneomeris.de

Advertisement

loading
Need help?

Need help?

Do you have a question about the Softwater RS and is the answer not in the manual?

Questions and answers

Summary of Contents for Neomeris Softwater RS

  • Page 1 Page 1 of 8 NEOMERIS Softwater RS Installation instruction and operation manual Gebr. Heyl Vertriebsgesellschaft für innovative Wasseraufbereitung mbH I Max-Planck-Straße 16 I D- 31135 Hildesheim Phone: +49 (0) 5121 7609-0 I Fax: +49 (0)5121 7609-44 www.heylneomeris.de...
  • Page 2: Application Limits

    Installation 0.5 gal). The maximum length of the hose is 5 meters (16.4 ft). The maximum level of The NEOMERIS Softwater RS monitor waste water transfer is 1m (3ft) above the needs the following connections: device. In case it is impossible to provide •...
  • Page 3 Please mount the device with the holes at the rear. Connect the flow controller and the NEOMERIS Softwater RS with the “yellow/6 mm” hoses. Be careful that you don’t mix up the forward and backward flow. Connect the waste water with “red hose/8mm”...
  • Page 4  Test the sensor (hard or soft) Function:  Brine washout The NEOMERIS Softwater monitor consists of a The sensor has to be “soft“ at the end of the re- hardness sensor, multi-way-valve with motor and electrical control. The multi-way-valve is generation-process.
  • Page 5 Page 5 of 8 Structure of NEOMERIS Softwater RS Operation:  Put pressure on the soft-water pipe.  Start the regeneration manually.  Observe the process—brine should be drawn into the brine pipe. It is possible to see the brine flushing in the pipe.
  • Page 6 Maintenance: button. To change the time between regene- ration, scroll through the menu by using the “↑“ The NEOMERIS Softwater RS doesn’t need a “↓“ ll „regen. rep. me“ appears. Confirm with preventive maintenance but we recommend an annual checkup and the exchange of the “✓...
  • Page 7 Page 7 of 8 In case the process display is displayed (Regene- ration in 6d 23h etc.), confirm with “✓ “ to open the regeneration menu. Now select “start re- gen.?“ by “ENTER“ or “ESC“ to cancel. Press “✓” if you want to start the regeneration. In case the regeneration was not successful it is displayed: The sensor did not regenerate and is still „hard“.
  • Page 8: Troubleshooting

    Page 8 of 8 Troubleshooting The table shows the most common problems. In case it is not possible to solve the problem with this table, please contact the customer service. Problem Reason Solution “—> No sensor, proceed with  No brine available ...