Summary of Contents for Sentry Buildings West Virginia
Page 1
All manuals and user guides at all-guidesbox.com Sentry Buildings Assembly Book :2G#$23%H'/+"%F7%@A@@ West Virginia BCDEF@D%;)#*3#(0 Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 !"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'* &'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$ ;)#*3#(0%<.$12&$7%=(+4...
Page 3
All manuals and user guides at all-guidesbox.com Foundation Types & Measurements ImportantW I,) 6#** (223 1, "'G2 ' -/,-2/ 9,)(3'1#,( #($1'**23 1, $)--,/1 1"2 8)#*3#(04 R2-2(3#(0%,(%1"2%#(12(323%)$2%3212/&#(2$%6"'1%1.-2%,9%9,)(3'1#,(%#$%82$14 Do Not &'L2 1"2 9,)(3'1#,( *'/02/ 1"'( 1"2 8)#*3#(0 $#[24 b"2( #($1'**#(0 1"2 8)#*3#(0 ,( ' +,(+/212 $*'87 #($1'** 1"2 $#3#(0 9*)$"...
Page 4
All manuals and user guides at all-guidesbox.com Step 1 Assemble (2) Two 92-1/2" Rear Wall Frames B4 ?)1 J@K 16, @E]\UD J,(2 6#** 82 1/2'123K 1, ' *2(01" ,9 f@\B_@e4 Q,$#1#,( 1"2 8,'/3$ 1,021"2/ '(3%#(3#+'12%6#1"%DgD%%&'/L$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 @4 H'/L%'%D?D%'(.6"2/2%821622(%9#/$1%16,%$1)3%&'/L$4%!"#$%#$%/292/2(+23%#(%'%*'12/%$12-4 92-1/2 Top Wall Plate 92-1/2"...
Page 5
All manuals and user guides at all-guidesbox.com Step 2 Assemble (2) Two 8' Long Side Wall Frames B4 <2*2+1%J@K%16,%@E]\UD%J,(2%6#**%82%1/2'123K%#9%(2+2$$'/.%1/#&%1,%'%*2(01"%,9%fCe4%Q,$#1#,(%1"2 8,'/3$%1,021"2/%'(3%#(3#+'12%6#1"%DgD%%&'/L$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 96" Top Wall Plate 96" Treated Bottom Plate 15-1/4" 16" 16" Stud Spacing @4 =($1'** J^K $2G2( -/2\+)1 6'** $1)3$ 821622( 1"2 1,- '(3 8,11,& -*'12$4 d'#* 1"2 1/2'123 8,11,&...
Page 6
All manuals and user guides at all-guidesbox.com Step 3B Assemble (4) Four 12' Side Wall Frames continued @4 =($1'** JBAK 12( -/2\+)1 6'** $1)3$ 821622( 1"2 1,- '(3 8,11,& -*'12$4 d'#* 1"2 1/2'123 8,11,&%-*'12%1,%2'+"%6'**%$1)3%6#1"%J@K%16,%BC3%0'*G'(#[23%32+L%('#*$4%5$2%J@K%16, BA3%+,'123%$#(L2/%('#*$%-2/%$1)3%1,%$2+)/2%1"2%1,-%-*'124 F4 :2-2'1%1,%8)#*3%JFK%1"/22%(,/2%B@D%*,(0%6'**%9/'&24 ]4 H'/L%8,1"%9/'&2$%DSide Wall Frames'%'(3%$21%9/'&2$%'$#324 Pre-cut 2x4 Wall Studs Treated Bottom Plate...
Page 7
All manuals and user guides at all-guidesbox.com Step 5 Assemble 15'-5" Front wall Door Frame B4 ?)1%J@K%16,%@E]\BCD%J,(2%6#**%82%1/2'123K%1,%'%*2(01"%,9%BU`e4%Q,$#1#,(%1"2%8,'/3$%1,021"2/%'(3 #(3#+'12%6#1"%DgD%%&'/L$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'123%'(3%'(%D<D%6"2/2%1"2%3,,/%"2'32/ $)--,/1%$1)3$%6#**%82%*,+'12344 15' - 5" Wall Plates 99" Door Header Regular Treated 96" Door Opening 17-1/2" 28-1/2" 17-1/2" 19-1/2" When setting the wall panels the door opening can be positioned on the right, as shown below, or reverse framing to position on the left end of the wall.
Page 8
All manuals and user guides at all-guidesbox.com Step 6 Set Wall Frames Front and back wall frames are positioned between long side walls. B4 =($1'** ,(2 ,9 1"2 f@\B_@e /2'/ 6'** 9/'&2$ '0'#($1 #($#32 ,9 ' UD $#32 6'** 9/'&24 IMPORTANT: Z/#2(1 2(3 &'/L23 6#1"...
Page 9
All manuals and user guides at all-guidesbox.com Step 7 Install 2x4 Tie Plates B4 =($1'**%'%BCD%*,(0%@E]%,(%1"2%8'+L%6'**4%5$2%BA3%$#(L2/$%$-'+2%BCe%'-'/1%1,%$2+)/2%1#2%-*'12$4 @4 :2-2'1%1,%#($1'**%'%BCD%*,(0%@E]%1#2%-*'12%,(%1"2%,--,$#12%9/,(1%6'**4 16' Long 2x4 Tie Plate 12' Long 2x4 Tie Plate Back Wall Frames F4 =($1'**%'%@E]\B@D%,(%1"2%$#32%6'**4%!"2%@E]%6#**%8)11%'0'#($1%1"2%BCD%*,(0%1#2%-*'12%,(%1"2%8'+L 6'**4%5$2%BA3%$#(L2/$%$-'+23%B@e%'-'/14 ]4 =($1'**%'(,1"2/%%@E]\B@D%8,'/3$%,(%1"2%$'&2%$#32%6'**%9/'&24 `4 ?)1%1,%9#1%'(3%#($1'**%'%@E]\UD%8,'/3%1,%9#(#$"4 C4 :2-2'1%1,%#($1'**%@E]%1#2%-*'12$%,(%1"2%,--,$#12%$#32%6'**%9/'&2$4 Step 8A Install Siding on Wall Frames If a siding panel has a damaged edge, install this edge at a corner where it will be covered with corner trim.
Page 10
All manuals and user guides at all-guidesbox.com Step 8B Install Siding on Wall Frames continued B4 =($1'** ' 9)** 6#31" $#3#(0 -'(2* ,( 1"2 $#32 6'** 6#1" 1"2 DPXQD 2302 9*)$" 6#1" 1"2 @E]$ ,( 1"2 8'+L%6'**4%=($1'**%J^K%$2G2(%&,/2%$#3#(0%-'(2*$4%=9%(2+2$$'/.%+)1%*'$1%-'(2*%9*)$"%6#1"%@E]$%,( 9/,(1%6'**4%%5$2%U3%0'*G4%8,E%('#*$%$-'+23%Ue%'-'/14 @4 =($1'**%'%$#3#(0%-'(2*%,(%1"2%8'+L%6'**%6#1"%1"2%DPXQD%2302%9*)$"%6#1"%1"2%$#3#(0%,(%1"2%$#32 6'**4%=($1'**%F%&,/2%-'(2*$4 F4 =($1'** $#3#(0 ,( ,--,$#12 $#32%6'**4...
Page 11
All manuals and user guides at all-guidesbox.com Step 9 thru 11 Steps not needed with this size and model. Step 12 Install Stairs IMPORTANT: Go now to the instructions in the stair kit book to install the stairs, floor joist and flooring.
Page 12
All manuals and user guides at all-guidesbox.com Step 13A Assemble Rear Gable Assemble the roof gables and trusses on the center of the loft floor. This will make it easier to stand the gable upright over the lower wall. B4 ?)1 J@K 16, @E]\BAD 8,'/3$ 1, ' *2(01" ,9 f^\B_@e4 Q,$#1#,( 1"2$2 @E]$7 on edge '(3 8)11 1,021"2/4 @4 Q,$#1#,(%J@K%16,%UB\F_]e%*,(0%@EC$%'(3%J@K%16,%^B\F_Ue%*,(0%@EC%8,'/3$%,(%1"2%@E]%-*'12$%'$ $",6(%82*,64%!"2%1,-%@EC%8,'/3$%"'G2%8*)2%&'/L$%,(%1"2%2(3$4%Q,$#1#,(%1"2$2%2(3$%1,021"2/ '1%1"2%1,-4...
Page 13
All manuals and user guides at all-guidesbox.com Step 13B Assemble Rear Gable continued Two Ridge Gussets have equal angles cuts. Four Knee Gussets have offset angles cuts. B4 <2+)/2%1"2%@EC%8,'/3$%1,021"2/%'1%1"2%L(22%'(3%/#302%6#1"%B_@e%Z<;%0)$$21$4 5$2%C3%+,&&,(%('#*$4%d'#*%`\B_]e%E%B@e%Z<;%9#**2/$%6"2/2%$",6(%82*,64 5/1/4" x 12" OSB Gusset 1/2" Gusset at Ridge 5-1/4" x 12" 1/2"...
Page 19
All manuals and user guides at all-guidesbox.com Step 21 Install Roof Trusses B4 =($1'**%@EC%"'(02/$%,G2/%1"2%DgD%&'/L$%,(%1"2%1/)$$%-*'12%'(3%9*)$"%6#1"%,)1$#32%2302%,9%@EC4 5$2%B\B_@e%N,#$1%"'(02/%('#*$4%<21%1/)$$%*20$%#(1,%"'(02/4%5$2%BA3%+,'123%$#(L2/%('#*$%1,%$2+)/2 1"2%1/)$$%1,%1"2%&21'*%"'(02/%J)$2%"'(02/%2.2*21$%1,%0)#32%1"2%('#*$%'1%1"2%+,//2+1%'(0*2K4 2x4-12' Board @4 :2&,G2%1"2%@E]\B@D%8,'/3$%)$23%1,%8/'+2 1"2 9/,(1 0'8*24 X$ .,) -/,0/2$$ $211#(0 1/)$$2$ 1'+L%1"2$2%8,'/3$%1,%L22-%1/)$$2$%-*)&84 R,(D1 /2&,G2 1"2 @E]$ )(1#* 1"2 /,,9 $"2'1"#(0 #$%'--*#234 2x6 Metal Hanger Step 22 Install Soffit...
Page 20
All manuals and user guides at all-guidesbox.com Step 23 Install Front Gable Soffit B4 =($1'**%UB\F_]e%*,(0%@E]$%,(%1"2%1,-%,9%1"2%9/,(1 0'8*27 9*)$" 6#1" 1"2 1,- ,9 1"2 0'8*2 9/'&24 =($1'** 2x4x81-3/4" 1"2%2(3$%6#1"%1"2%8*)2%&'/L%1,021"2/%'1%1"2%-2'L ,9%1"2%0'8*24%5$2%BA3%$#(L2/$%$-'+23%B@e%'-'/14 @4 =($1'** U@\`_Ue *,(0 @E]$ ,( 1"2 $#32 ,9 1"2 9/,(1 0'8*27%9*)$"%6#1"%1"2%$#32%,9%1"2%0'8*2%9/'&24 F4 =($1'** J@K 16, Ue 6#32 E ]U\F_]e $,99#1 -'(2*$ )(32/ 1"2 @E]$ 6#1"...
Page 21
All manuals and user guides at all-guidesbox.com Step 24B Install Roof Sheathing continued @4 ?)1 J@K 16, ]UeEfCe Z<; $"221$ #( "'*9 1, &'L2 J]K 9,)/%]UeE]Ue%$"221$4%:2\+)1%,(2%1,%FCeE]Ue4 48"x59" Roof F4 <1'/1#(0%'1%0'8*2%L(22%#($1'**%/,,9%$"2'1"#(0%'1%1"2 Sheathing 9/,(1%,9%1"2%8)#*3#(07%refer to the sheathing layout below4 5$#(0 ' $1/'#0"1 2302 -,$#1#,( 1"2 9#/$1 $"221$ -*)&8%6#1"%1"2%$,99#1%-'(2*$4%!"2%/,,9%$"2'1"#(0 Straight Edge...
Page 22
All manuals and user guides at all-guidesbox.com Step 25A Install Front Gable Trim B4 =($2/1 ' UB\F_]e *,(0 @E] 821622( 1"2 $,99#1 -'(2*$ '(3 1"2 /,,9 $"2'1"#(0 ,( 1"2 )--2/ 0'8*24 5$2%B\B_]e%1/#&%$+/26$%1,%$2+)/2%1"2%$,99#1%-'(2*$%1,%1"2%@E]$4%5$2%^3%$#(L2/$%1,%$2+)/2%1"2 /,,9%$"2'1"#(0%1,%1"2%@E]$4 @4 =($2/1%'(3%$2+)/2%U@\`_Ue%*,(0%@E]$%821622(%1"2%$,99#1%-'(2*$%'(3%1"2%/,,9%$"2'1"#(0%,(%1"2 $#32%,9%1"2%0'8*24 2x4x81-3/4" 2x4x81-3/4" 2x4x82-5/8" 2x4x82-5/8" F4 =($1'**%'%F\B_@e%E%Ue%1/#&%8,'/3 1,%1"2%8,11,&%,9%1"2%@E]$%)$#(0 B\B_]e%1/#&%$+/26$4...
Page 23
All manuals and user guides at all-guidesbox.com Step 25B Install Front Gable Trim continued ]4 =($1'**%U@\B_]e%*,(0%BEC%1/#&%8,'/3$%'1%1"2%1,-%,9%1"2%0'8*24 Blue Ends Together =($1'** 1"2 2(3 6#1" 1"2 8*)2 &'/L#(0 '1 1"2 /#3024 =($1'** BEC 9*)$" 6#1" 1"2 1,- ,9 1"2 /,,9 $"2'1"#(04 5$2 U3 0'*G4 ('#*$4 82-1/4"...
Page 24
All manuals and user guides at all-guidesbox.com Step 27 Install 1x4 Trim Around Door Opening 1x4 Door Trim B4 ?)1 1, *2(01" '(3 #($1'** BE]\UD 1/#& 8,'/3$%,(%1"2%$#32$%,9%1"2%3,,/ ,-2(#(07%9*)$"%6#1"%1"2%BEC%N'&8%4 5$2%U3%0'*G4%('#*$4 @4 ?)1 ' BE]\BAD 1/#& 8,'/3 '(3 #($1'** '+/,$$ 1"2 3,,/ ,-2(#(07 +2(12/23 '+/,$$ 1"2 1,- ,9%1"2%$#32%3,,/%1/#&4 Step 28 Install 2x4s Around Door Jamb...
Page 25
All manuals and user guides at all-guidesbox.com Step 29 Install Windows B4 X--*.%+')*L#(0%,(%$#3#(0%'/,)(3%1"2%6#(3,6%,-2(#(0%829,/2%#($1'**#(0%1"2%6#(3,6$4 @4 =($2/1%6#(3,6%#(%,-2(#(04%O,*3%1"2%6#(3,6%#(%-*'+2%)$#(0%'%926%U3%0'*G4%('#*$4 F4 ;)11 BEF 1/#& 8,'/3$ '*,(0 2'+" $#32 ,9 1"2 6#(3,67 9*)$" 6#1" 1"2 1,- 9/'&24 !"2 BEF $#32 1/#& 6#**%2E12(3%F\B_@e%82*,6%1"2%6#(3,6%9/'&2%1,%/2+2#G2%1"2%8,11,&%1/#&4%!"2%1,-%1/#&%6#**%/2$1 ,(%1"2%$#32%1/#&4%:292/%1,%1"2%+"'/1%82*,6%9,/%1"2%1/#&%6#31"%'(3%*2(01"%1,%82%)$234 ]4 <2+)/2%1"2%1/#&%8,'/3$%)$#(0%JCK%$#E%$1'#(*2$$%1/#&%$+/26$4 `4 =($1'**%BE]%1/#&%'+/,$$%1"2%1,-4%X--*.%+')*L#(0%'*,(0%1"2%1,-%,9%1"2%1/#&%8,'/34 C4 ?)1%1,%9#1%'%BE]%1/#&%8,'/3%'(3%#($1'**%)(32/%1"2%6#(3,6%821622(%1"2%BEF%$#32%1/#&4 ^4 =($1'**%$")112/$%6#1"%$+/26$%-/,G#3234 Nailing Flange...
Page 26
All manuals and user guides at all-guidesbox.com Step 30 Install Roofing — Not Supplied in Kit Optional Roof Covering B4 =($1'**%&21'*%/,,9%D3/#-D%230#(0%'*,(0%1"2 -2/#&212/%,9%1"2%/,,94 83*4 :,,9%<"#(0*2$ @4 =($1'**%$"#(0*2$%'++,/3#(0%1,%1"2%#($1/)+1#,($ -+$4 :,,9%D3/#-D%a302\BAD ,(%1"2%6/'--2/4 fFA $M4%914 S2*1%Q'-2/ Packing Lists Qty. Material Shipped in Extension Kit Qty.
Page 27
All manuals and user guides at all-guidesbox.com Q'+L#(0 P#$1 b2$1%j#/0#(#'%BCD%b#32%E%F@D%;)#*3#(0%i#1 Qty. Material Shipped on 'A' Pallet Qty. Material Shipped on 'B' Pallet Q/2\8)#*1%T'8*2%S/'&2$ @B\F_]e E% !/)$$%\%!,-%?,/3 E UB\F_]e Q/2\8)#*1%T'8*2%S/'&2$ Bf\B_]e E T'8*2%ZG2/"'(0 E UB\F_]e Q/2\8)#*1%@E]%R,,/%O2'32/ @E] F^\B_@e T'8*2%b'**%<1)3$ E C]\B_@e Q/2\8)#*1%@E]%b34%O2'32/ T'8*2%!/#&...
Need help?
Do you have a question about the West Virginia and is the answer not in the manual?
Questions and answers