Please take some time to read this manual carefully. It contains detailed information about the handling of the Akku Vision Test Tower, of your battery, its functions and its care, as well as the usage of the E-Bike Vision fast charger.
Humidity should be in the range of 0 to 80 %. • Safety notes Don’t make any changes on the Akku Vision Test Tower. Especially, consider that you are not allowed to • open the device, or rather modify it, otherwise you lose your warranty claim.
The covers of charge/discharge connectors must be replaced immediately on loss, otherwise warranty void. • That way, you do have the maximum saftey! Datum 2023-10-27 Akku Vision - Manual Akku Vision Test Tower S. 5 / 15 Index 03...
• Do not charge NiCd, NiMh or primary cells! • Use the charger only with the appropriate EBV E-Bike Batteries of Akku Vision! • When not using for a longer period, disconnect the mains supply and also connected batteries. •...
The commissioning The Akku Vision Test Tower is a versatile battery test device that reads and analyses batteries of the own brand E- Bike Vision and compatible batteries. USB Type C D-SUB 7-polig 1. Connect the Akku Vision Test Tower to the mains via the 12 V power supply unit.
Page 8
The additional driver is needed to connect the Akku Vision Test Tower to your PC. Click on "Next” Agree to the licence agreement and click "Next" to continue with the installation. Datum 2023-10-27 Akku Vision - Manual Akku Vision Test Tower S. 8 / 15 Index 03...
Page 9
Click on "Finish“ Now open the newly installed Akku Vision Test Tower app, which you will find on your desktop or in the Start menu. Datum 2023-10-27 Akku Vision - Manual Akku Vision Test Tower S. 9 / 15 Index 03...
Page 10
Enter the access key from the e- mail in the field provided. Click on "Finalize registration“ Datum 2023-10-27 Akku Vision - Manual Akku Vision Test Tower S. 10 / 15 Index 03...
Page 11
In the device selection you have an overview of the available categories. Select your battery and the main Diagnostic screen opens. Confirm the selection with "Yes“ Datum 2023-10-27 Akku Vision - Manual Akku Vision Test Tower S. 11 / 15 Index 03...
Page 12
If you want to stop the process, click on "Capacity Test - Stop". If you want to output a report, click on "PDF Report". Datum 2023-10-27 Akku Vision - Manual Akku Vision Test Tower S. 12 / 15 Index 03...
Page 13
The Akku Vision Test Tower can be updated via the software. Select the device in the overview and confirm the selection. Datum 2023-10-27 Akku Vision - Manual Akku Vision Test Tower S. 13 / 15 Index 03...
Page 14
As soon as the update has been completed, the Akku Vision Test Tower is up to date with the latest software. Datum 2023-10-27 Akku Vision - Manual Akku Vision Test Tower S. 14 / 15 Index 03...
Software error – Update necessary LED 1, 2, 3, 4 and 5 flashing: Akku Vision Test Tower is not connected to the Software via PC LED 1, 2, 3, 4 and 5 on: Akku Vision Test Tower is connected Software via PC...
Need help?
Do you have a question about the TEST TOWER and is the answer not in the manual?
Questions and answers