Getting Started with Nova Carter Step 1: Remove the Lidar Cover Step 2: Connect Monitor, Keyboard, and Mouse Remove screws holding the LIDAR cover in place using Connect peripherals to the rear IO panel. You may use the included 2.5 mm hex driver. Reinstall the screws once the provided USB-C to USB-A dongle for convenience.
Page 5
Getting Started with Nova Carter Step 3: Power On Step 4: Start Using Jetson Begin developing your robot using the familiar NVIDIA Hold the power button to turn the robot on. Jetson AGX Orin™ Linux environment. Default Username: nvidia Password: nvidia...
Page 6
Getting Started with Nova Carter Emergency Stop Use Charging the Robot Press the Emergency Stop (E-Stop) button to immediately cut To charge Nova Carter, connect the included wall charger to the motor power. The front indicator light will blink red while the E- charge port.
Product Overview 3D Mapping Configuration Basic Cargo Top Configuration Getting started guide is based on the 3D Mapping Configuration Alternate product configuration...
Certifications Item Standard Qualified or not Certification report or not CB/CE-safety IEC/EN 62133-2: 2017 Qualified UL2271 UL2271 (sent from UL) Qualified EU Battery Directive 2013/56/EC Qualified RoHS/REACH/PoPs Qualified S/SG/AC.10/11, Article 38.3, Dangerous UN38.3 Goods Transport Simulation Test of Qualified United Nations SDS/MSDS Qualified ECE R10...
Need help?
Do you have a question about the Nova Carter AMR Development Robot and is the answer not in the manual?
Questions and answers