•
•
ALIGNMENT PREPARATION
Test equipment required
1. Oscilloscope
2 ACSSVM
3. De
SSVM
4. B-ohrn dummy load
5.
AM. FM. Signal
Generator (25 to
t300 MHz)
6. Distortion
Meter
•
•
NOTE1:
Use
non-metsttic
runing tools:
The test
eautoment
and Receiver should be warmed up at least 30 minutes before proceeding
w;th alignment.
Input signal from the Generator should be kept as tow as possible and still obtain usabIe output.
•
•
•
•
•
-
i
J) -