Section 1: Important Safety Instructions Please comply with all warnings and operating instructions. Save this manual for future reference. Carefully read and follow these instructions before installing the unit. Do not operate this unit before reading through all safety information and operating instructions carefully.
Equipment Installation Location • The transformer must be installed in an indoor environment with a temperature range from 0°C to 40°C. • The transformer must be installed in an environment with a relative humidity from 0% to 95%, non-condensing. • The transformer should be installed in an environment with an altitude of 1000 meters (3,281ft.) or lower with no derating.
It is recommended to mount the transformer near the bottom of the rack. • Suggested positions for planning installation when used with the Panduit 5-10kVA UPS systems are shown in the image(s) below. Figure 1 Transformer Location between the 5-10kVA Panduit UPS and UVP240 Battery Pack (Front view left.
Four-Post Rack Mounting The transformer units come with the hardware required for installation in a standard EIA or JIS seismic rated four-post rack with square or M5 threaded mounting holes. The rail assemblies adjust to mount in 19” racks with a front-to-rear distance of 460~1000 mm (18 to 39 inches).
Page 7
d. Tighten all 12x screws to secure the left and right rails to the rack. e. Install the 4x M5 cage nuts in the rack front equipment rail, with square holes. One in each of the first locations below the bottom rail kit screw and one in each of the first locations above the top rail kit screw (see figure below).
Page 8
3. Install the transformer into the rack: a. After installing the mounting brackets onto the transformer, slide the transformer into the rack on the rail kit (see figure below). Figure 6 2 RU UPS or Transformer placement. b. Align the mounting brackets with the screw holes on the rack and secure the UPS with the supplied 4x Phillips Hex Head M5 screws (see figure below).
Tower Mounting • The transformer may be mounted in a tower orientation. It is not recommended to mount the transformer in the tower orientation without the use of the stabilizing tower mounting feet. • Only the stabilizing tower mounting feet containing foam pads (included in the kit) are to be used.
The Step-Down Transformer front panel is a 2 RU form factor designed to conform with the Panduit 5-10 KVA UPS product line. The front panel contains air flow vents and a moniker denoting the identity of the unit. The molded faceplate is removeable via push- in tabs on the sides.
Page 11
Figure 11: Step-Down Transformer Front Panel Air Flow Vents The air flow vents are critical to the operation of the Step-Down Transformer unit. These vents must remain clean and clear of all objects that may restrict the air flow through the unit.
Page 12
outlet groups contains three outlets and are protected by a 20A breaker. The breaker is resettable via a manual push button. Outlet GROUP 1 and GROUP 2 are paired and may share up to 3000 VA load (1500 VA each). Outlet GROUP 3 and GROUP 4 are paired and may share up to a 3000 VA load (1500 VA each).
Page 13
UTFMRDU Figure 12: UTFMRDU Rear Panel 4. NEMA 5-20R 3. L6-30R Output 1. Input Cord 2. Input Breaker Group 1 Output (Group 5) (120 VAC) 5. NEMA 5-20R 6. NEMA 5-20R 7. NEMA 5-20R 8. Output Breaker Group 2 Output...
The output breaker may and power is present at the outlets. does not reset once have malfunctioned. tripped. If problem persists, contact Panduit customer support for repair or replacement options. Reduce the load on the transformer The transformer may be outlets.
Page 17
If the troubleshooting procedures do not solve the problem, contact Panduit Customer Support at cs@panduit.com or 1-800-777-3300 with the following information. • Product SKU and serial number. • Detailed explanation of the fault. UPS STEP-DOWN TRANSFORMER USER MANUAL...