EAST OAK DB23003 Owner's Manual

150 gallon deck box

Advertisement

Quick Links

150 Gallon Deck Box
Owner's Manual
MODEL:
DB23003
EASTOAK.COM
DECK BOX
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DB23003 and is the answer not in the manual?

Questions and answers

Summary of Contents for EAST OAK DB23003

  • Page 1 150 Gallon Deck Box Owner’s Manual MODEL: DB23003 EASTOAK.COM DECK BOX...
  • Page 2 Questions? Comments? Reach out us for expert support! support@eastoak.com eastoak.com 1-833-EAST-OAK (USA) (1-833-327-8625) Follow eastoakliving on Claim your 3-year warranty Please scan the QR code to view the installation video at eastoak.com/warranty 1-833-327-8625 SUPPORT@EASTOAK.COM EASTOAK.COM DECK BOX...
  • Page 3: Important Caution

    IMPORTANT CAUTION PARTS LIST Once installed, the product cannot be detached. Please strictly follow each step in the installation manual. • Please check all parts and components to ensure that there are no damages or missing items before starting the construction of the product. If you have any problems or discover any missing parts, please contact customer service Front&Back Panel Front Panel with Logo...
  • Page 4 ASSEMBLY INSTRUCTIONS Install 2 Panels A(without logo): Insert 2 Reinforced Metal Rods D to the end and then Align 2 Rubber Plugs Q with the hole and install it buckle 2 panels together. (X2) (X1) on Bottom Panel C. Please note that the directions of the arrows The letter marks on the A/A+Logo/B/C/F/J are consistent.
  • Page 5 Assemble two B panels to A panels and C panel. Please Put the assembled Side Panel A on the flat ground, and then buckle the Bottom Panel C in. note that the directions of the arrows on Panel A and B are consistent.
  • Page 6 Gently pull the side panel and align Partition Panel N with Please install the Lid Conecters G1,G2 and 2 the card slot. Reinforced Metal Rods D to Lid Panel F. (X1) (X1) (X2) (X1) (X1) Tips: Dismantling of partition panel: Lift the partition board up and out of the buckle position, and then pull the front and rear side panels slightly to take it out.
  • Page 7 Please install Lock Bracket-1 G to Lid Panel. Connect Lid Panel F to Lid Panel J. (X2) (X1) (X1) (X5) CLICK Clamping ring installation Assemble the Reinforced Bridge P to the Lid Panel. (X1) Reinforce the Lid Panel Reinforced For easier installation, Plastic Hinge E Bridge with crews should tilt to one side, then to the other Please insert the grooved part...
  • Page 8 Tighten Plastic Hinge E with 8 Screws Assemble 2 Hydraulic Rods H1 to Lid Panel with 4 Screws. (X4) (X2) (X8) With LOGO Assemble 2 Hydraulic Rods H1 to Side Panel B with 6 Screws. Installation completed. (X6) 1-833-327-8625 SUPPORT@EASTOAK.COM EASTOAK.COM DECK BOX...
  • Page 9: What's In The Box

    Padlock WARRANTY POLICY GUARANTEED 3-YEAR WARRANTY Thank you for choosing East Oak. This product is covered by our company warranty for up to 3 years from its original purchase date. CLAIM WARRANTY If you’d like to claim your product’s warranty, register your new product on our website at www.eastoak.com/warranty.
  • Page 10 support@eastoak.com eastoak.com 1-833-EAST-OAK (USA) 1-833-327-8625 SUPPORT@EASTOAK.COM...

Table of Contents