QUICK START GUIDE
400A Generator Breaker Kit for NE-S and NE-M
150049763 - Kit is not compatible with NE-M high current plants featuring all horizontal distribution panels
Read and follow all safety statements, warnings, and precautions in this guide.
Tools required:
•
Torque wrench - 0-240 in-lb/28 Nm
•
Screw Driver - Phillips #2
•
Sockets - 7/16", 9/16"
Step 1 - Power Down System
Disconnect power to all equipment prior to conducting any work.
Step 2 - Determine Location for Breakers
Load connections are made to bullet-style distribution (selectable) positions configured as Load Breaker Positions.
Install breakers on horizontal distribution panels.
Step 3 - Install 400A Breaker Assembly
Breaker may be installed in single voltage or selectable voltage distribution panels.
Breakers must be installed before generator connection is made.
Breaker must be installed in:
•
Primary Voltage Positions - fed by rectifiers, not converters
•
Critical Load Positions - in systems with Low Voltage Load Disconnect.
1.
Install standoffs into 4 topmost four positions of the output rail.
2.
Install breaker assembly in position.
a. Place insulator over standoffs
b. Tighten screws into standoff. Torque to 4-5 Nm (40 in-lb)
•
Selectable Voltage Panel Shown
•
For Single Voltage Panel
•
Flat Head Screws use the (Row 2) locations.
Page 1
© 2023 OmniOn Power Inc. All rights reserved.
Flat Head Screw Locations
For -48V
For +24V
(Row 2)
(Row 1)
Selectable Voltage Panel Shown
Standoff Positions
Output Rail
Insulator
For +24V (Row 2)
For -48V (Row 1)
400A Generator Breaker Kit_QSG
Optional Return
Bus Adapter
850021775
2)
+24V (Row
-48V (Row 1)
Standoffs
Rev.2.1
Need help?
Do you have a question about the 150049763 and is the answer not in the manual?
Questions and answers