LCD Setting

After pressing and holding ENTER button for 3 seconds, the unit will enter setting mode. Press "UP" or "DOWN"
button to select setting programs. And then, press "ENTER" button to confirm the selection or ESC button to
exit.
Setting Programs:
Program
Description
00
Exit setting mode
Output source priority:
01
To configure load power
source priority
Maximum charging
current: To configure
total charging current
for solar and utility
02
chargers.
(Max. charging current
= utility charging
current + solar charging
current)
Selectable option
Escape
Solar first
Utility first (default)
SBU priority
Available options in 1KVA/2KVA model:
10A
30A
50A (default for PWM model)
16
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to power
all connected loads, battery energy will
supply power the loads at the same
time.
Utility provides power to the loads only
when any one condition happens:
- Solar energy is not available
- Battery voltage drops to low-level
warning voltage or the setting point in
program 12.
Utility will provide power to the loads as
first priority.
Solar and battery energy will provide
power to the loads only when utility
power is not available.
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to power
all connected loads, battery energy will
supply power to the loads at the same
time.
Utility provides power to the loads only
when battery voltage drops to either
low-level warning voltage or the setting
point in program 12.
20A
40A (default for MPPT model)
60A (only available for MPPT model)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lightup e2000

Table of Contents