NAD 314 Service Manual

NAD 314 Service Manual

Stereo integrated amplifier
Hide thumbs Also See for 314:

Advertisement

SERVICE SAFETY PRECAUTIONS (UL)
1. Use exact replacement parts for critical locations marked
" /!\\"
2. Return lead dress to original position and re-install protective covers.
3. Before returning to customer, test for shock hazard; use either mothod A or B:
A. Leakage test "cold":
1. Unplug the AC cord; turn power switch ON.
2. Connect one lead of High Voltage Insulation Tester to both prongs of the AC plug.
3. Touch other lead to all exposed metal parts.
4. Impedance measurement must be 0.3-5.0 Megohms.
B. Leakage test, "live" :
1. Plug unit directly into the AC outlet: do not use isolation transformer.
2. Connect one lead of the Leakage Current Tester to earth ground.
3. Touch other lead to all exposed metal parts.
4. Leakage measurement must be less than 0.5 milliamps.
314
STEREO
INTEGRATED
SERVICE
MANUAL
314
STEREO
INTEGRATED
om
——
LL
=
o.
=
=f

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 314 and is the answer not in the manual?

Questions and answers

Nick Smith
June 26, 2025

NAD 314 integrated amp - What is the resting/standby power consumption?

Subscribe to Our Youtube Channel

Table of Contents