Download Print this page

Husky 72WB01SS-THD Operator's Manual page 2

6 ft workbench

Advertisement

HARDWARE
CARTON CONTENTS
TOOLS REQUIRED:
^ 1 ° ©
Socket Wrench
3/8in Socket Extension
B. Rail - Top Back
7/16in Deep-well Socket
3/8in Wrench
C. Workbench Top
Drill
1/8in Drill bit
D. Rail - Top Front
Square
Tape measure
E- Bottom Rail
OPTIONAL TOOLS: Screwdriver, Flathead and 7/16-in
Open End Wrench
ASSEMBLY
SIDE CONSTRUCTION
Items Needed:
A-Side (Qty: 2)
AA - 1/4-20 X 5/8in Carriage Bolt (Qty: 4)
BB-5/16in Washer (Qty: 4)
CC -1/4-20 Flange Nut (Qty: 4)
EE - Screw Leveler (Qty: 4)
FF - Leveling Foot, Left (Qty: 2)
GG - Leveling Foot, Right (Qty: 2)
Process:
• Place (1) leveling foot pad FF and (1) leveling foot pad
GG on each side at the bottom. Make sure each leveling
foot is fully seated on each corner.
• Secure each Leveling Foot with (1) boltAA, (1) Washer
BBand(1)NutCC.
• Wrench tighten.
•Assemble (1) leveler EE in each leveling foot Some
adjustments may be necessary after workbench is in
desired position.
Figure 1
TOP RAIL ASSEMBLY
Items Needed:
B-Rail-Top Back (Qty: 1)
D-Rail-Top Front (Qty: 1)
AA -1/4-20 X 5/8in Carriage Bolt (Qty: 8)
BB-5/16 Washer (Qty: 8)
CC - 1/4-20 Serrated Flange Nut (Qty: 8)
Process:
• Place Workbench Top, with stainless steel side facing
down. (Use packaging material to prevent scratches.)
NOTE: The Rail with the Husky® nameplate should be
placed toward the front of the unit with the nameplate
position upside down.
•Assemble (2) sides A and rails B and D, as shown using
(8) bolts AA, (8) washer BB, and (8) nut CC. Holes on
rails should be facing to the outside of the workbench top.
• Finger tighten.
Front
Holes
facing out
Back
Figure 2
3

Advertisement

loading