Samsung NP950QED Repair Manual page 62

Table of Contents

Advertisement

2
Using the tweezers, place the Main to Sub FPC in accordance with the guide line of
Sub and Main PBA.
Connect the FPC from Main to Sub side with pressing both side of FPC.
Make sure that the connection is completed after pressing both side of FPC.
Connect the SUB cable to the sub PBA and the MAIN cable to the main PBA.
Disassembly and Assembly
62

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nt950qed

Table of Contents