1400 mb/s bit error rate tester
generator and analyzer (376 pages)
Summary of Contents for Atec ROD-L M25
Page 1
Advanced Test Equipment Corp. www.atecorp.com 800-404-ATEC (2832) Operation & Service Manual ROD-L M25 25 Amp Ground Tester...
Page 5
1-13 Table 1-1 lists the most important electrical, environmental and 1-10 1-11 The ROD-L 25 amp Ground Testers are completely self c o ntained rugged instruments designed for laborat or y and production testing environments. EQUIPMENT SUPPLIED The ROD-L Ground Tester is comprised of the following: Ground Tester, ROD-L Model 25amp Ground.
REPACKAGING FOR SHIPMENT Mark the container "FRAGILE - DELICATE INSTRUMENT!' 2-20 OPERA TING CONTROLS reshipment. Environmental conditions during storage and reshipment should be as fo11ows: 167 degrees F(75 degrees C) Maximum temperature -40 degrees F (-40 degrees C) Minimum temperature 2-17 If possible, use the original shipping container and packing materials, 2-18...
Page 11
FUNCTION CONTROL INDEX NO TABLE 2-1 CONTROLS ANO INDICATORS FIG. 2-2 This switch applies or LINE POWER ON (Sl) removes_ power from the instrument. When lit, indicates power ON LAMP (11) is applied to the instrument When depressed, START Pushbutton (S2) the test sequence begins if the instrument is grounded properly and...
Page 12
TABLE 2-1 CONTROLS AND INDICATORS {continued) FIG. 2-2 CONTROL FUNCTION INDEX NO Ohms Meter (RMeter) Provides a direct reading of the Resistance of the tested instruments ground loop. Indicates amount of AC Total Current Meter current in (AMPS) flow ( I METER) during a test.
Page 13
Rear panel jack for chassis BP-2 Gnd sense from ROD-L Hi pot Tester. {®) 13-- � f� l Figure Controls and Indicators...
2-22 OPERATIONAL CHECK (25 AMP GROUND TESTER ONLY) Check line voltage at outlet. Set rear panel voltage select s witch to closest Line Voltage Range. Connect 25 amp Ground Tester to Power outlet. Turn AC On Switch to ON. AC on Lamp should light READY lamp should light Insert 25amp banana plug cord into chassis ground plug.
2-23 TEST TIME ADJUSTMENT PROCEDURE 2-24 The Test Time Adjustment potentiometer is factory set for 5-7 seconds. The user should reset this control as necessary in accordance with the regulatory agency suggested test time for the device under test. To reset the test time duration, proceed as follows: Turn OFF power to M25 Remove top cover and locate Test Ti me Adjustment potentiometer...
Page 17
2-11 Put front panel switch in Ground/HP position for sequential testing. If ground test only is performed ;,laced switch in ground position. Sequential testing or ground only test will be initiated by starting ground tester. Hipot tester's chassis Gnd voltage must connect to BP-2 Rear Panel Banana Jack.
PUSH START BUTTON The READY light of the Hipo Tester should go off since the safety Gnd return test from the device under test is taken over by the M25 Gnd tester using the relays Kl and K2 (see Dwg. #00431-01). The safety Gnd return is connected to the Gnd tester chassis and the chassis Gnd voltage output thru BP-1 is connected to the High Current Transformer.
THEORY OF OPERATION SECTION Ill THEORY OF illGH CURRENT GROUND TESTING GROUNDING CONTINUITY 3- 1 Three production line tests are required by most regular agencies. These basic stept are grounding continuity, dielectric strength, and leakage current. The grounding of a product is one of the basic met hods of protection required by both international and domestic' safety agencies.
Page 20
Grounding continuity tests are also required to assure the s a fety and protection of manufacturing personnel during the performance of subsequent dielectric strength tests and leakage current tests. The grounding test achieves a two-fold purpose: (1) It assures the satisfactory completion of subsequent tests, and (2) assures that the second test can be accomplished without undue hazard to the test operator.
INSTRUMENT FUNCTIONAL DIAGRAM Functionally, the GND tester is divided into three sections: The High Current generator and the General Control. A remote control option can be added to the total system (as shown in Fig. 3-2). The High Current generator consist of an AC transformer (50/60 Hz) specially designed to provide the current needed in the ground test.
INSTRUMENT ASSEMBLY DIAGRAM The General Control can be commanded from the different front and rear panel controls shown on the left side of the diagram. It takes care of coordinating the different activities and sensing the status of the operation. It provides continuous monitoring through the front panel lights, buzzer and meters shown on the right side of the diagram.
Page 23
3-10 TOTAL CURRENT DETECTOR The A22 Board (Dwg. 446-01) receives the voltage across the current sense resistor set composed of 8 resistors of 2ohm 50W each giving a total resistance of 0.25 ohm. -----------, SENSE RESISTORS SOLID HIGH CURREN' HIGH CURRENT RELAY TRANSFORJ\1EF STATE...
Page 24
o f the test latch (pin 11) drives the transistor QI to provide a LOGIC CONTROL INPUT/OUTPUT LINES PROVISION FOR FUTURE REMOTE PROGRAMMING 3-12 The remote signal at pin C of the edge connector can activate the transistor Q2 when no remote programming is desired, connecting pin C of the edge connector to +5V.
Page 25
The start signal also triggers the DELAY timer Ull for getting the RELAYS set up and at the end of the delay the START PULSE timer is triggered. This pulse gates the zero crossing pulses produced by-Q8 and trigger the TEST TIMER Ull. The output of the test timer drives the TEST LIGHT through U8 and drives the analo g switches in U 3 for enabling the monitoring of current and resistance.
Page 29
4-11 FAIL POTS CALIBRATION 4-12 connected to the M25 output p ush the START button. The resistance 4-10. Push the START button. While the test light is ON, slowly turn 4-13 TEST TIME CALIBRATION 4-14 maximum about 90 seconds. If not, troubleshoot timer or call ROD-L 4-15 RESISTANCE CALIBRATION 4-16...
Page 30
NO AC POWER Check fuses Fl and F2. They might be 3 amperes slow blow fuses for 120 VAC operation and 2 amperes slow blow fuses for 240 VAC operation. RECOMMENDED FUSES: LI'ITELFUSE MANUFACTURER 120 VAC 3AG SLO BLO Type 313003 240 VAC 3AG SLO BLO Type 313002...
Page 32
F'ARTS LIST ROO-L ELECTRONICS, INC. ASSEMBLY DESCRIPTION: AlO POWER SUPPLY ASSEMBLY NUMBER: 00459-02 REV.A F:ATING AND/OR MFR. NUMBER QTY. ITEM F:EFERENCE DESCRIPTION □ PCB, RAt,J 00459-02 470uf CAF'AC I TOR, C4,C5 3300uf CAF't'1C I TOR, CAF'AC I TOR, EL C2,C3,C6 :3',5V �...
Page 35
REMOTE CONTROL - REV G FUNCTIONAL DESCRIPTION Remote Control contains three options: AUTOMATIC RESET DIGITAL REMOTE CONTROL ANALOG MONITORING The AUTOMATIC RESET option is supposed to generate a short dur ation FAIL and RESET pulse after a failure is latched in the A22 At the end of the FAIL pulse the system is Control Logic Board.
Page 36
OPTICAL ISOLATED CONTROL This part provides three inputs: RESET, START, and SELECT "A" and three outputs: READY, TEST, and FAIL. The input current requirement are: Rev G HIGH LEVEL 40 uA +5V LOW LEVEL 1.6 mA for 0.4V The output current capabilities are: HIGH LEVEL 2.27mA@ +5V LOW LEVEL...
Page 37
REMOTE CONT,ROL OPTION 25 PIN CONNECTOR ASSIGNMENT 1,16 RESISTANCE GND (ISOLATED) GND (CHASSIS) AC;DC EXT V REF RESET EXT I TRIP EXT V TEST START EXT V RISE +5V (REMOTE) READY V OUT TEST I OUT FAILURE EXT IR OUT SELECT A IR OUT .,.,...
Page 38
ROD-L ELECTRONICS, INC. PARTS LIST ASSEMBLY DESCRIPTION: AB REMOTE CONTROL LOGIC W/ AUT O -RESET ASSEMBLY NUMBER: 00445-02 REV. F RATING AND/OR ITEM REFERENCE QTY. DESCRIPTION MFR. NUMBER 1 AB RAW PCB 00445-02 ROD-L 2 C1 ,C2 CAPACITOR 10uf 2 5 V TANT 3 C4 CAPACITOR 6.Buf 10V TANT...
Need help?
Do you have a question about the ROD-L M25 and is the answer not in the manual?
Questions and answers