Introduction
This quick installation guide describes the main steps to follow for successful commissioning of the Copeland™ CO
Scroll refrigeration unit models OME-16T-TEM & OMTE-37/49/64T-TEM. It is not intended to replace the unit's
application guidelines, to explain the functionality of the refrigeration unit or to help optimize the system parameters.
2
First steps
When receiving the unit, please do the following:
✓ Check the integrity of the unit's transport packaging.
✓ Check if the unit is pressurized with 2 bar nitrogen.
✓ For the OME-16T model only, remove the transport bracket from the unit. Please refer to Figure 1 below and
to section 3.6 "Transport bracket" in the unit's application guidelines for more information.
Figure 1: Transport bracket on the OME-16T model
✓ Follow the instructions in the application guidelines when dealing with BOM version OM(T)E-**T-TEM-*-2**
(split/flexible models).
The piping between the unit and the evaporators shall be designed taking into account the design pressures.
If the system piping design pressure (PS) is lower than 90 bar in the liquid line, additional safety devices are required.
An additional safety device in the suction line is required in any case.
The minimum required design pressure (PS) is 80 bar for the liquid line and 60 bar for the suction line. Longer
standstill times of the unit can be achieved by a design pressure of more than 60 bar in the suction line.
TI_Unit_OMTE_CO2_Scroll_06_EN_Rev01
™ CO
S
R
CROLL
2
Q
I
UICK
NSTALLATION
Ref: TI_Unit_OMTE_CO2_Scroll_06_EN_Rev01
Application Engineering Europe
U
EFRIGERATION
NITS
G
UIDE
2
1/9
Need help?
Do you have a question about the OME-16T-TEM and is the answer not in the manual?
Questions and answers