Testing The Inside Of The Sicharge Uc Dispenser - Siemens SICHARGE UC 150 UL Installation And Operation Manual

Plug-in dispenser
Table of Contents

Advertisement

10.4 Testing the inside of the SICHARGE UC dispenser

Maintenance interval
• Testing every 12 months
WARNING
Qualified electrician
Only a qualified and trained electrician may work on the SICHARGE UC dispenser.
Visual check of the inside
1. Check the plug holder for humidity, dust and corrosion
2. Check for correct function:
– Relay
– Lights
– Other display elements
Mechanical check of the inside
1. Check the tightening torque of 0.5 to 0.6 Nm of the connections L1, N and PE
2. Check the tightening torque of 45 Nm of the connections DC+, DC- and PE, and apply sealing paint
3. Check the eight fastening points that hold the SICHARGE UC dispenser to the pedestal
Installation and Operations Manual | SICHARGE UC 150 UL Plug-in Dispenser
107

Advertisement

Table of Contents
loading

Table of Contents