In spite of careful elaboration this manual may contain errors or incompletion. s::can does not assume liability for errors or loss of data due to such faults in the manual. The original manual is published in English and German by s::can. This original manual serves as the reference in case discrepancies occur in versions of the manual after translation into third languages.
This s::can product has been developed, tested and manufactured for electromagnetic compatibility (EMC) and according to applicable European standards, as defined in the declaration of conformity. CE-marks are applied on the device. The declaration of conformity related to this marking can be requested from s::can or your local s::can sales partner or can be downloaded from the s::can Customer Portal.
Immediately upon receipt, please check the received consignment for completeness on the basis of the delivery note and check for any possible damage incurred during shipping. Please inform the delivering dispatcher and s::can immediately in case of any damages in transit.
Establish power supply to the con::cube and wait until moni::tool software has started up. Configure the pipe::scan monitoring station (see section 5.8 and con::cube manual). Connection of all Sensors to the Cable Hub The cable hub is equipped with four connection cables for the s::can sensors with sys-plugs and one orange cable with a specific plug for the pressure sensor. Connect the orange cable to the pressure sensor, which is located in the middle of the other sensors first. Then connect the other plugs to the sensors installed in the pipe::scan. The sensor cable, which is approx.
Return Consignment (RMA) Return consignments of the s::can monitoring system, or parts of the system, shall be done in a packaging that protects the device (original packaging or protective covering if possible). Before returning a consignment, you have to contact your s::can sales partner or s::can customer support (support@s-can.at).