Download Print this page

Penguin CO16 Instruction Manual

Oval double car shelter

Advertisement

Available languages

Available languages

Quick Links

MANUEL D'INSTRUCTIONS
INSTRUCTION MANUAL
ABRI DOUBLE OVAL
OVAL DOUBLE CAR SHELTER
sku: CO16
sku: CO18
sku: CO20

Advertisement

loading

Summary of Contents for Penguin CO16

  • Page 1 MANUEL D’INSTRUCTIONS INSTRUCTION MANUAL ABRI DOUBLE OVAL OVAL DOUBLE CAR SHELTER sku: CO16 sku: CO18 sku: CO20...
  • Page 2 ÉTAPES 1. ARCHES CENTRALES a) Prendre une arche centrale (F) et assemblez à chaque bout une extension (E). Notez que l’extension (E) a un trou qui est à 6” d’une des extrémités; cet extrémité est pour le coin d’arche, et non l’arche centrale. b) Sur chacune des autres extrémités des extensions (E), installez un coin d’arche principal (H).
  • Page 3 ÉTAPES 1. ASSEMBLAGE DES STRUCTURES a) Prendre 2 pattes à 2 trous (I) et les installer sur l’arche du bout avec le rail de porte. b) Prendre 2 pattes à 1 trou (J) et les installer sur l’arche régulière. c) Placer l’arche du bout debout à l’intérieur de la structure et attacher les tuyaux de connexion (06-385) à...
  • Page 4 ÉTAPES 1. INSTALLATION DU TOIT (Les attaches à l’intérieur) a) Mettre la toile devant l’abri tel qu’illustré. b) Dépliez la toile tel qu’indiqué et la monter sur l’abri tel quel. c) La partie avant du garage est avec des fenêtres. d) Assemblez le toit sur la structure de l’abri en vous assurant que le triangle soit à...
  • Page 5 SCHÉMA - SCHEMA...
  • Page 6 STEPS 1. CENTER ARCHES a) Take one center arch (F) and assemble at each end an extension (E). Note that extension (E) has a hole at 6” from one end, this endgoes into the corner arch, not the center arch. b) At each end of (E), install one corner arch 1 hole (H).
  • Page 7 STEP 1. ASSEMBLY OF STRUCTURES a) Take 2 legs with 2 holes (I) and install them on the end arch. b) Take 2 legs with 1 hole (J) and install them on the regular arch. c) Place an end arch upright with the rail door inside the structure and attach connecting pipes (06-385) at each hole inside the shelter with 4”...
  • Page 8: Cover Installation

    STEP 1. COVER INSTALLATION a) Place cover in front of the completed structure as shown in schema. b) Unfold the cover as shown and place it onto the structure. c) The front of the shelter is the side with windows (1 on the left. 1 on the right, if included). d) Assemble roof on the structure making sure that the triangular corner is at the front.
  • Page 9 LISTE DE PIÈCES - PARTS LIST QTÉ/QTY Pièce # Description Part 16’ 20’ 24’ 28’ 32’ Rail de porte Door Rail Jonction rail de porte 93-481 Door rail junction Retenu pour rail de porte 95-262 Door rail holder Renfort d’arche 93-184 Crossbar Extension...
  • Page 10 LISTE DE PIÈCES - PARTS LIST QTÉ/QTY Pièce # Description Part 16’ 20’ 24’ 28’ 32’ Diagonale 59¾" 06-369 Diagonal Clou 90-012 Nails Crochet de plancher 90-013 Floor Brackets Elastique + crochet ‘’S’’ 90-014 Elastic + S-Hook Crochet pour Rail de Porte 01-357 Door Rail Hook Noix papillon...
  • Page 11: Garantie

    7. Le produit ne sera garanti que s’il est installé conformément aux instructions écrites de Gazebo Penguin incluses avec le produit.
  • Page 12: Warranty

    • 2 YEARS FOR THE CANVAS • 5 YEARS FOR THE STRUCTURE In the event that the product is damaged or the warranty period has expired, please contact Gazebo Penguin’s Customer Experience Department for a complete list of replacement parts and prices.

This manual is also suitable for:

Co18Co20