Do you have a question about the NOMINAL 300 CFM and is the answer not in the manual?
Questions and answers
Subscribe to Our Youtube Channel
Summary of Contents for Voltaire NOMINAL 300 CFM
Page 1
* A more recent revision may be available at www.voltairesys.com or the QR Code in the top right corner of every page. www.voltairesys.com Phone: (407) 378–7482 VoltAire Doc. # DA0322A VoltAire Systems, LLC 2900 W. Orange Ave. Ste. 100 Published: June 13, 2023 Apopka, FL 32703...
1. IMPORTANT INFORMATION TO REVIEW PRIOR TO INSTALLATION, OPERATION AND MAINTENANCE READ THE ENTIRE MANUAL PRIOR TO INSTALLING, OPERATING AND MAINTAINING the VoltAire Systems Pressurization Module. Do not install or perform maintenance on the equipment if you do not understand all of the instructions.
Personal Protection Equipment 3. PRODUCT DESCRIPTION VoltAire Systems pressurization modules are designed to be mounted on Bard HVAC Units, sizes 1.5 to 3 tons (W18 through W36), to provide fan powered pressurization air through the Bard unit and into the building, providing positive pressure to the building after pre-conditioning the outside air with the Bard unit.
FIGURE 1: PRESSURIZATION MODULE MODEL NOMENCLATURE FIGURE 2: PRESSURIZATION MODULE PLENUM MODEL NOMENCLATURE VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023 and Maintenance Manual...
Page 6
FRONT OF BARD UNIT WITH RIGHT HAND SIDE PRESSURIZATION MODULE (WITH PLENUM) FIGURE 4: GENERAL CONFIGURATION AND AIRFLOW FIGURE 5: DIMENSIONS VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023 and Maintenance Manual...
2. Using foil tape (field supplied), tape the metal edge and internal insulation to provide a clean edge as shown VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation...
Page 8
Bard side panel. Before fully securing the two screws, ensure the plenum is level. VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023...
Page 9
Note that the 18-inch length runs across the top of the unit. FIGURE 11: PRESSURIZATION MODULE MOUNTING SURFACE MOUNTS TO PLENUM VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023 and Maintenance Manual...
Page 10
For Pressurization Modules with fire/smoke shutdown, remove the factory jumper from the shutdown terminal block and replace with field supplied dry contacts. VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023...
Page 11
16. The unit is now fully installed and ready for operation, with Startup Instructions on the following pages. VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023...
IMPORTANT: REVIEW THE MANUAL IN ITS ENTIRETY PRIOR TO SERVICING OR MAINTAINING THE EQUIPMENT. VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023 and Maintenance Manual...
Page 13
Adjustment occurring during economizer mode, adjust the plate on the economizer modification kit to reduce the opening on the economizer exhaust. FOR ADDITIONAL TECHNICAL SUPPORT, PLEASE CONTACT VOLTAIRE SYSTEMS AT (407) 378-7482. VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A...
8. WIRING DIAGRAMS VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023 and Maintenance Manual Page 14 of 20...
Page 15
VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023 and Maintenance Manual Page 15 of 20...
VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023 and Maintenance Manual Page 16 of 20...
VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023 and Maintenance Manual Page 17 of 20...
VoltAire Systems, LLC Pressurization Module with VoltAire Doc. # DA0322A Specifications are subject to change without notice Plenum Installation, Operation Published: June 13, 2023 and Maintenance Manual Page 18 of 20...
Ship replacement parts to the Purchaser for the Purchaser's infield replacement of the part. Infield replacement will require the Purchaser to provide a purchase order to VoltAire for the standard cost of the VoltAire Systems, LLC Pressurization Module with VoltAire Doc.
Page 20
(14) days of receipt of the returned part VoltAire will review and analyze the returned part. If the part is found to be defective by VoltAire a credit will be issued to the Purchaser. Parts returned to VoltAire and found not to be defective will result in no credit applied to Purchaser's account and the Purchaser will be required to pay for the replacement part.
Need help?
Do you have a question about the NOMINAL 300 CFM and is the answer not in the manual?
Questions and answers