Outsunny 344-054V00 Manual page 3

Nest swing
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
- Check for missing parts.
- Check the equipment ground clearances.
Operational inspection (1 to 3 months)
- Check the stability of the construction.
- Check every part for excessive wear and replace when necessary.
Annual inspection (1 to 2 times per year)
- Check for rust and corrosion.
- Check every part for excessive wear and replace when necessary.
INSTRUCTIONS
Fast and easy tool free set up instructions.
1. Separate parts and lay out swing on the ground. Make sure to unfold the mat and alight
the logo before you proceed.
2. Notice the tubes have male and female ends. Place the plastic rope hub over the male
side of the tube and then insert the female side by depressing the small push button pin.
3. Listen for a "CLICK" and check to be sure the push button has popped back out and is
holding the tubes together securely.
4. Connect steel rings to secure anchor or tree swing strap carabiner.
5. Adjust the height of the swing by sliding the ropes up or down through the "s" rings on
the rope.
A ≥ 0,04 h + B
h=2,5 m B=65 cm
(0,04x250cm)+65cm
WARNING! Only for domestic use. Not suitable for children under 3 years.
To be used under the direct supervision of an adult. Long cord, risk for strangulation! Risk
of falling!
A distance between the suspension
points along the crossbeam.
B distance between the junction points
of the swing element and the means of
suspension.
h distance from the ground to the lower
side of the crossbeam.
A ≥ 75cm
3

Advertisement

Table of Contents
loading

Table of Contents