ASSEMBLY SEQUENCE
EQUIPMENT FOR BUILDING-IN:
1.
Make the shoes by making 500x500x500mm holes on the ground
or according to the sketch attached.
2.
Insert the parts into the holes and level.
3.
Screw the parts using the screws supplied and then tighten.
4.
Fill the shoes with concrete according to the sketch attached.
5.
Wait for the concrete to set for 24 hours.
EQUIPMENT FOR SCREWING:
1.
Put the parts in their place and then level.
2.
Screw the parts with the screws supplied and then tighten.
3.
Drill the holes on the ground with a Ø12 widia bit, insert M10 split
(not supplied) and then tighten. The spit length depends on the
concrete-slab thickness.
294
2959
3171
6266
GENERAL ASSEMBLY INSTRUCTIONS:
Finish with safety floor or protective material against falls.
Check all safety plugs. Check for no packaging waste.
Check the conditions of the entire park.
Common tools are needed for the installation: a set of
spanners, box spanners, wrench, hammer, binders,
torque wrench, leveller and general construction tools.
IDENTIFICATION AND COMPONENTS
MARK
QUANTITY
DESCRIPTION
1
1
FIREMAN´S POLE
2
1
ROOF "SUN"
3
1
ROPE BRIDGE
4
1
ROOF "PALM"
5
1
STEPS LADDER
6
1
CLIMBING LADDER
4
5
3
6
IMPACT SURFACE -
29.15 m²
GENERAL VIEW
IM-PT537
Ref:
TREASURE ISLAND
Description:
PLAYGROUND
FREE FALL HEIGHT: 1200mm
ACCORDING TO THE EN-1176 STANDART:
This game does require safety floor.
Date:
30/05/2023
1
2
Rev: 0
1/2
IMP-4208
Rev: 5
2010-Nov-26