Advertisement

Quick Links

OPERATING MANUAL
AES PowerPack Plus 48 V
AES SuperPack 48 V
1
AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PowerPack Plus 48 V and is the answer not in the manual?

Questions and answers

Summary of Contents for AES Akku Energie Systeme PowerPack Plus 48 V

  • Page 1 OPERATING MANUAL AES PowerPack Plus 48 V AES SuperPack 48 V AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 2 AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 3 You have chosen a AES PowerPack Plus or AES SuperPack from AES Akku Energie Systeme GmbH. We are delighted that you have chosen a long-life product that was manufactured to the highest industrial standards. Your AES Team AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 4 Operating manual „AES PowerPack Plus 48 V „AES SuperPack 48 V“ AES Akku Energie Systeme GmbH Biedenkamp 8 21509 Glinde Germany www.akkuenergiesysteme.de Phone: +49 40 298433 0 info@akkuenergiesysteme.de Dated: 07/2023 Version 1.1.1 AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 5: Table Of Contents

    ..............1. Safety Instructions for using the AES PowerPack Plus 48 V and the AES SuperPack 48V .
  • Page 6 , the user manual must be transferred. Limitation of Liability AES Akku Energie Systeme GmbH does not assume any liability for any personal injury, damage to property, damage to the product or consequential damage caused by non-observance of this manual, improper use of the product, repairs or other work carried out on the product by non-qualified electricians.
  • Page 7: Safety

    Never charge or use a damaged AES PPP / AES SP. • Do not charge the AES PPP / AES SP unattended. • The charging location should be equipped with a functioning class D fire extinguisher (for metal fires AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 8: Safety Instructions For Charging The Aes Powerpack Plus 48 V And The Aes Superpack 48 V

    AES PPP / AES SP. CAUTION: If you want to clean the AES PPP / AES SP, make sure that it is not connected to the charger or to any system. AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 9: Fire Protection Instructions

    Plus / AES SuperPack respectively, comply with applicable regulations. Notify the fire service and draw the attention of fire service personnel to the following dangerous goods: UN3480, lithium-ion battery, Class 9. AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 10: General Instructions For Handling

    General Instructions for Handling Illustration This shows a AES PPP / AES SP from every angle: front (handle with charge status display); top AES PPP, bottom AES SP rear (with socket), AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 11 AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 12: General Instructions For Handling

    The display shows both the voltage of the battery in volts and the charge status. This is represented by a battery symbol with 1 to 7 bars, as well as numerically in percent. AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 13: Installing The Battery In The Holder

    As soon as you have inserted the battery completely, you need to fix it in the holder. For this reason, lock the holder with the key provided for this purpose. Remove the key and store it safely. AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 14: Note On Correct Storage

    When using a single charger, be sure to grip the charger plug as shown in the picture below. Do not hold the plug by the cable either when plugging it in or when unplugging it. AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 15 To charge an AES PPP / AES SP, a charger with a maximum charge voltage corresponding to the battery must be used. An original charger or one approved by AES must be used. AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 16: Display Of Charge Level Status

    7 bars as well as numerically in percent. Additionally, the current voltage of the battery is shown in volts (V). To set the charge level indicator on a new battery, it must first be fully charged and then completely discharged. AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 17: Technical Features

    L 400 x B 268 x H 89 Casing ABS plastic ABS plastic Charging Temperature +32 °F to +113 °F +32 °F to +113 °F Discharge Temperature -4 °F to +140 °F -4 °F to +140 °F AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 18: Care Instructions

    Please use a soft, clean and lint-free cloth. Electrical tests The electrical test of the AES PPP / AES SP 48 V takes place at the manufacturer AES Akku Energie Systeme GmbH where all relevant data such as capacity, end-of-charge voltage, quiescent voltage and the uniformity of the individual cell voltages are checked.
  • Page 19: Ce Declaration Of Conformity

    CE- Declaration of Conformity AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 20 AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...
  • Page 21 AES Akku Energie Systeme GmbH Biedenkamp 8 21509 Glinde Germany Tel: +49 40 298433 0 info@akkuenergiesysteme.de www.akkuenergiesysteme.de AES Akku Energie Systeme GmbH, Biedenkamp 8, 21509 Glinde...

This manual is also suitable for:

Superpack 48 v

Table of Contents