Wall-mounted and floor-mounted integrated energy storage

Advertisement

Dear users:
Thank you very much for choosing our products! Before using this product, please read
this manual carefully, which includes the installation, use, and Troubleshooting and other
important information and suggestions, and take good care of this manual! Product
specifications are subject to upgrading without prior notice.
USER'S
MANUAL
BDB-2.76L Wall-mounted and floor-mounted
integrated energy storage user manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BDB-2.76L and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for NEP BDB-2.76L

  • Page 1 Troubleshooting and other important information and suggestions, and take good care of this manual! Product specifications are subject to upgrading without prior notice. USER'S MANUAL BDB-2.76L Wall-mounted and floor-mounted integrated energy storage user manual...
  • Page 2: Table Of Contents

    1. Basic information of the manual 1.1 This manual is applicable to the integrated integrated power supply 51.2V/54Ah series products for home energy storage applications produced by Suzhou Enyipu Technology Co., LTD. 1.2 Target group CATALOGUE This manual is used by the end users. No specific qualification operation can also be handled by the end user itself.
  • Page 3: Product Introduction

    2. Product introduction 3. Installation instructions This product is 51.2V DC pool system, applied in the field of home energy 3.1 Unpacking inspection constitute a complete storage, with inverter and other equipment, constitute a complete System, to (1) Open the packaging of the equipment, please check the product meet the daily electricity demand of households.
  • Page 4 3.4 Wall-mounted installation instructions >200mm >300mm >300mm >300mm Step 2: Install the bracket to the battery pack using the M5 screw in the accessory, torque 2.5N.m。 Step 1: The recommended distance of battery pack installation space is shown above, which can reduce the distance on the operational basis. Step 3: Refer to the printed positioning line at the bottom of Step 4: According to the position of the battery pack, determine the installation...
  • Page 5: Description Of The Use Of The Functions

    Step 2: Connect the cathode wire BAT- BAT+ ON/OFF Step 3: Connect the communication Step 4: Install the battery pack to the bracket using the M5 of 20N.m. BAT- BAT+ ON/OFF 4. Description of the use of functions 4.1 Wiring sequence Step 1: Connect the cathode wire harness to the battery BAT- "...
  • Page 6 4.3 LED instructions Step 5: Click the self-reset button to start the battery and run With 6 LED indicators, 4 white LED indicators for current battery pack SOC, 1 red LED is for fault indicator during alarm and protection, and 1 white LED is for battery standby, charging and discharge state.
  • Page 7: Product Parameters

    BMS is intact). 5. Product parameters order number project parameter product model BDB-2.76L BAT- BAT+ nominal voltage 51.2V nominal capacity 54Ah ON/OFF voltage range 40-57.6V...
  • Page 8: Storage And Packaging

    6. Overall dimensions 7.2 Packing list ・  Before unpacking the battery, check the damage and check the battery model. If there is any Otherwise, do not open the packing box, and contact the 350±2mm 160±2mm after-sales service center as soon as possible. ・...