Opal Energy SUN-3K-SG04LP1-24-EU User Manual

Opal Energy SUN-3K-SG04LP1-24-EU User Manual

Hybrid inverter

Advertisement

Quick Links

Hybrid Inverter
SUN-3K-SG04LP1-24-EU
SUN-3.6K-SG04LP1-EU
SUN-6K-SG04LP1-EU
User Manual
R
SUN-5K-SG04LP1-EU
SUN-3K-SG04LP1-EU
07/08/2021 11:11:10
Thu
0
2.00
7
0
0.00
5
KW
ON
KW
76%
Signal
on
0
-1.39
5
0
2.00
5
KW
KW

Advertisement

Table of Contents
loading

Summary of Contents for Opal Energy SUN-3K-SG04LP1-24-EU

  • Page 1 Hybrid Inverter SUN-3K-SG04LP1-24-EU SUN-3K-SG04LP1-EU SUN-3.6K-SG04LP1-EU SUN-5K-SG04LP1-EU SUN-6K-SG04LP1-EU User Manual 07/08/2021 11:11:10 2.00 0.00 Signal -1.39 2.00...
  • Page 2: Table Of Contents

    Contents 1. Safety Introductions ……………………………………………… 2. Product instructions 01-04 ……………………………………………… 2.1 Product Overview 2.2 Product Size 2.3 Product Features 2.4 Basic System Architecture 3. Installation 05-20 …………………………………………………………… 3.1 Parts list 3.2 Mounting instructions 3.3 Battery connection 3.4 Grid connection and backup load connection 3.5 PV Connection 3.6 CT Connection 3.6.1 Meter Connection...
  • Page 3 About This Manual The manual mainly describes the product informa�on, guidelines for installa�on, opera�on and maintenance. The manual cannot include complete informa�on about the photovoltaic (PV) system. How to Use This Manual Read the manual and other related documents before performing any opera�on on the inverter. Documents must be stored carefully and be available at all �mes.
  • Page 4: Product Overview

    2.1 Product Overview 1: Inverter Indicators 7: Meter Port 13: Power on/off bu�on 8: Func�on Port 2: LCD display 14: DC Switch 9: Parallel port 3: Func�on Bu�ons 15: PV input with two MPPT 10: Generator input 4: Ba�ery input connectors 16: Ba�ery 11: Load 5: RS 485 Port...
  • Page 5: Product Size

    2.2 Product Size Inverter Size Moun�ng bracket - 03 -...
  • Page 6: Product Features

    2.3 Product Features - Self-consump�on and feed-in to the grid. - Auto restart while AC is recovering. - Programmable supply priority for ba�ery or grid. - Programmable mul�ple opera�on modes: On grid, off grid and UPS. - Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng. - Configurable AC/Solar/Generator Charger priority by LCD se�ng.
  • Page 7: Parts List

    3. Installa�on 3.1 Parts List Check the equipment before installa�on. Please make sure nothing is damaged in the package. You should have received the items in the following package: Stainless steel an�-collision Hybrid inverter Wall moun�ng bracket x1 bolt M8×80 Stainless steel moun�ng Parallel communica�on L-type Hexagon wrench...
  • Page 8 3.2 Moun�ng instruc�ons Installa�on Precau�on This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site meets below condi�ons: · Not in direct sunlight · Not in areas where highly flammable materials are stored. · Not in poten�al explosive areas. ·...
  • Page 9 ≥500mm ≥500mm For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and approx. 50cm above and below the unit. And 100cm to the front. Moun�ng the inverter Remember that this inverter is heavy! Please be careful when li�ing out from the package. Choose the recommend drill head(as shown in below pic) to drill 4 holes on the wall, 82-90mm deep.
  • Page 10 Inverter hanging plate installa�on 3.3 Ba�ery connec�on For safe opera�on and compliance, a separate DC over-current protector or disconnect device is required between the ba�ery and the inverter. In some applica�ons, switching devices may not be required but over-current protectors are s�ll required. Refer to the typical amperage in the table below for the required fuse or circuit breaker size.
  • Page 11 All wiring must be performed by a professional person. Connec�ng the ba�ery with a suitable cable is important for safe and efficient opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for recommended cables. Please follow below steps to implement ba�ery connec�on: 1.
  • Page 12 3.3.2 Func�on port defini�on DIP Switch Inverter 1 2 3 4 5 6 7 8 BMS CAN RS 485 Meter parallel_1 parallel_2 HM G-V G-S BMS CAN: CAN port for ba�ery communica�on. *RS485: for energy meter communica�on. Batt Temp Gen start-up *Some hardware versions don't have this port.
  • Page 13 3.3.3 Temperature sensor connec�on for lead-acid ba�ery Inverter Temp. sensor - 11 -...
  • Page 14 3.4 Grid connec�on and backup load connec�on · Before connec�ng to grid, please install a separate AC breaker between inverter and grid. Also, it is recommended that installs an AC breaker between backup load and inverter.This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current.
  • Page 15 GEN PORT LOAD GRID - 13 -...
  • Page 16: Pv Connection

    Be sure that AC power source is disconnected before a�emp�ng to wire it to the unit. 3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well. 4.
  • Page 17: Ct Connection

    3.5.1 PV Module Selec�on: When selec�ng proper PV modules, please be sure to consider below parameters: 1) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of inverter. 2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage. 3) The PV modules used to connected to this inverter shall be Class A ra�ng cer�fied according to lEC 61730.
  • Page 18: Meter Connection

    3.6.1 Meter Connec�on Load Grid Inverter Breaker BMS CAN Port RS 485 Port Meter Port System connec�on diagram for the CHNT meter Grid Grid input Output RS 485 DDSU666 DIN-RAIL METER RS485A 230V 5(60) A 800imp/kWh RS485B CHNT DDSU666 CHINT meter Load Grid Inverter...
  • Page 19: Earth Connection(Mandatory)

    Note: In final installa�on,breaker cer�fied according to IEC 60947-1 and IEC 60947-2 shall be installed with the equipment. 3.7 Earth Connec�on(mandatory) Ground cable shall be connected to ground plate on grid side this prevents electric shock. if the original protec�ve conductor fails. 3.8 WIFI Connec�on For the configura�on of Wi-Fi Plug, please refer to illustra�ons of the Wi-Fi Plug.
  • Page 20: Wiring System For Inverter

    3.9 Wiring System for Inverter This diagram is an example for grid systems without special requirements on electrical wiring connec�on. Note: The back-up PE line and earthing bar must be grounded properly and DC Breaker effec�vely. Otherwise the back-up func�on may be abnormal when the grid fails. AC Breaker Load Battery...
  • Page 21: Single Phase Parallel Connection Diagram

    3.10 Single phase parallel connec�on diagram L wire N wire PE wire Inverter No.3 (slave) BMS CAN RS 485 Meter Load Grid Ground parallel_1 parallel_2 Inverter Inverter ④ ① DC No.2 Breaker ⑤ (slave) Load Grid ①②③ DC Breaker for battery SUN 3K-SG:90A DC breaker SUN 3.6K-SG: 120A DC breaker ②...
  • Page 22: Three Phase Parallel Inverter

    3.11 Three phase Parallel Inverter ①②③ DC Breaker for battery SUN 3K-SG:90A DC breaker SUN 3.6K-SG: 120A DC breaker SUN 5K-SG: 150A DC breaker SUN 6K-SG:200A DC breaker ⑤ AC Breaker for grid port SUN 3K-SG: 40A AC breaker SUN 3.6K-SG: 40A AC breaker SUN 5K-SG: 40A AC breaker SUN 6K-SG: 40A AC breaker ④...
  • Page 23: Operation

    4. OPERATION 4.1 Power ON/OFF Once the unit has been properly installed and the ba�eries are connected well, simply press On/Off bu�on(located on the le� side of the case) to turn on the unit.When system without ba�ery connected, but connect with either PV or grid, and ON/OFF bu�on is switched off, LCD will s�ll light up(Display will show OFF), In this condi�on, when switch on ON/OFF bu�on and select NO ba�ery, system can s�ll work.
  • Page 24: Lcd Display Icons

    5. LCD Display Icons 5.1 Main Screen The LCD is touchscreen, below screen shows the overall informa�on of the inverter. 12/18/2020 09:21:00 1.85 0.04 -1.79 0.02 1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it turns into "comm./FXX"...
  • Page 25 5.1.1 LCD opera�on flow chart Solar Page Solar Graph Grid Page Grid Graph Inverter Page Main Screen Battery Page BMS Page Load Page Load Graph Battery Setting System Work Mode Grid Setting System Setup Gen Port Use Basic Setting Advanced Function Device info - 23 -...
  • Page 26: Solar Power Curve

    5.2 Solar Power Curve Solar This is Solar Panel detail page. ③ ① ① Solar Panel Genera�on. Power: 1560W Today=8.0 KWH Voltage, Current, Power for each MPPT. ② ② PV1-V: 286V PV2-V: 45V Total =12.00 KWH ③ Solar Panel energy for Day and Total. PV1-|: 5.5A PV2-|: 0.0A P1: 1559W...
  • Page 27: Curve Page-Solar & Load & Grid

    Li-BMS Mean Voltage:50.34V Charging Voltage :53.2V Batt Total Current:55.00A Discharging Voltage :47.0V Data Mean Temp :23.5C Charging current :50A Total SOC :38% Discharging current :25A Stand-by Dump Energy:57Ah Details SOC: 36% Data U:50.50V I:-58.02A Li-BMS Power: -2930W Charge Volt Curr Temp Energy Fault...
  • Page 28: System Setup Menu

    5.4 System Setup Menu System Setup This is System Setup page. System Work Mode Battery Setting Gen Port Grid Setting Basic Advanced Device Info. Setting Function 5.5 Basic Setup Menu Basic Setting Factory Reset: Reset all parameters of the inverter. Lock out all changes: Enable this menu for se�ng Time Syncs Beep...
  • Page 29: Battery Setup Menu

    5.6 Ba�ery Setup Menu Battery Setting Ba�ery capacity: it tells Deye hybrid inverter to know your ba�ery bank size. Batt Mode Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V). Lithium 400Ah Batt Capacity Batt Use Ba� %: Use Ba�ery SOC for all the se�ngs (%). Mode Use Batt V Max A Charge...
  • Page 30 Generator This page tells generator output voltage, frequency, power. And, how much energy is used from generator. Power: 1392W Today=0.0 KWH Total =2.20 KWH L1: 228V Freq:50.0Hz Battery Setting Lithium Mode: This is BMS protocol.Please reference the document(Approved Ba�ery). Lithium Mode Shutdown 10%: It indicates the inverter will shutdown Batt if the SOC below this value.
  • Page 31: System Work Mode Setup Menu

    5.7 System Work Mode Setup Menu System Work Mode Work Mode Selling First: This Mode allows hybrid inverter to sell 5000 back any excess power produced by the solar panels to Selling First Max Solar Power the grid. If �me of use is ac�ve, the ba�ery energy also Work Zero Export To Load Solar Sell...
  • Page 32 Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load consump�on and charge ba�ery and feed into grid.
  • Page 33: Grid Setup Menu

    5.8 Grid Setup Menu Grid Setting Please select the correct Grid Mode in your local area. Grid Mode General Standard If you are not sure, please choose General Standard. UL1741& IEEE1547 Grid Please select the correct Grid Type in your local area, CPUC RULE21 Set1 otherwise the machine will not work or be damaged.
  • Page 34 5.9 The method of CEI-021 Standard Self-Check Grid Setting Firstly, �ck the “CEI-021” and “220V single phase/50Hz” Grid Mode General Standard on the grid se�ng menu. UL1741& IEEE1547 Grid CPUC RULE21 Set1 SRD-UL-1741 CEI-0-21 Grid Type 220V Single Phase 120/240V Split Phase 120/208V 3 Phase Grid Warning Grid Mode: CEI 0-21...
  • Page 35 Inverter ID : 2012041234 During the self-test process, all the indicators Self-Test OK will be on and the alarm keeps on. Testing 59.S1... Test 59.S1 OK! When all the test items shows OK, Testing 59.S2... Test 59.S2 OK! which means the self-test is completed Testing 27.S1...
  • Page 36: Generator Port Use Setup Menu

    5.10 Generator Port Use Setup Menu GEN PORT USE GEN PORT USE Generator input rated power: allowed Max. power from diesel generator. Mode AC couple on grid side GEN connect to grid input: connect the diesel generator to the Generator Input grid input port.
  • Page 37: Advanced Function Setup Menu

    5.10 Advanced Func�on Setup Menu Advanced Function Solar Arc Fault ON: This is only for US. System selfcheck: Disable. this is only for factory. Solar Arc Fault ON Backup Delay Gen Peak-shaving: Enable When the power of the generator exceeds the rated value of it, the inverter will Func Clear Arc_Fault provide the redundant part to ensure that the generator...
  • Page 38: Device Info Setup Menu

    5.11 Device Info Setup Menu Li-BMS Li-BMS Device Info. This page show Inverter ID, Inverter version and alarm Inverter ID: 1601012001 Flash Charge Charge Volt Volt Curr Curr Temp Temp Energy Energy Fault Fault codes. HMI: Ver0302 MAIN:Ver 0-5213-0717 Volt Volt Curr Curr...
  • Page 39 Mode III: With Smart-Load AC cable DC cable On-Grid Home Load Grid Solar Backup Load Battery Smart Load Mode IV: AC Couple On-Gen+AC couple AC cable DC cable On-Grid Home Load Grid Solar Backup Load Battery On-Grid Inverter On-Load+AC couple AC cable DC cable On-Grid Inverter...
  • Page 40: Fault Information And Processing

    On-Grid+AC couple AC cable DC cable Backup Load Solar On-Grid Inverter On-Grid Home Load Battery Grid Smart Load The 1st priority power of the system is always the PV power, then 2nd and 3rd priority power will be the ba�ery bank or grid according to the se�ngs. The last power backup will be the Generator if it is available.
  • Page 41 Error code Description Solutions 1. When inverter is in Split phase(120/240Vac) or three-phase GFDI _Relay_Failure system (120/208Vac) system, the backup load port N line needs to connect ground; 2. If the fault still exists, please contact us for help. 1. When the grid type and frequency changed it will report F13; 2.
  • Page 42 Error code Description Solutions 1. Check the backup load connected, make sure it is in allowed power range; ACOvercurrent fault 2. If the fault still exists, please contact us for help. No Utility 1. Please confirm grid is lost or not; No AC grid 2.
  • Page 43 Under the guidance of our company, customers return our products so that our company can provide service of maintenance or replacement of products of the same value. Customers need to pay the necessary freight and other related costs. Any replacement or repair of the product will cover the remaining warranty period of the product.
  • Page 44: Datasheet

    9. Datasheet SUN-3K- SUN-3K- SUN-3.6K- SUN-5K- SUN-6K- Model SG04LP1-24-EU SG04LP1-EU SG04LP1-EU SG04LP1-EU SG04LP1-EU Battery Input Date Ba�ery Type Lead-acid or Li-lon Ba�ery Voltage Range(V) 20-30V 40-60V Max. Charging Current(A) 140A 120A 135A Max. Discharging Current(A) 140A 120A 135A Charging Curve 3 Stages / Equaliza�on External Temperature Sensor Op�onal...
  • Page 45 SUN-3K- SUN-3K- SUN-3.6K- SUN-5K- SUN-6K- Model SG04LP1-24-EU SG04LP1-EU SG04LP1-EU SG04LP1-EU SG04LP1-EU Certifications and Standards VDE4105,IEC61727/62116,VDE0126,AS4777.2,CEI 0 21,EN50549-1, Grid Regula�on G98,G99,C10-11,UNE217002,NBR16149/NBR16150 IEC/EN 62109-1,IEC/EN 62109-2,IEC/EN 61000-6-1, EMC/Safety Regula�on IEC/EN 61000-6-2,IEC/EN 61000-6-3,IEC/EN 61000-6-4 General Data Opera�ng Temperature Rande(℃) -40~60℃, >45℃ Dera�ng Cooling Smart cooling Noise(dB) <30 dB(A) Communica�on with BMS...
  • Page 46 CAN Port Meter_CON port This port is used to connect the energy meter. 1 2 3 4 5 6 7 8 RS485 Pin RS485B RS485A RS485B RS485A RS485A RS485B - 44 -...
  • Page 47: Appendix

    11. Appendix II 1. Split Core Current Transformer (CT) dimension: (mm) 2. Secondary output cable length is 4m. Lead Outside Ver: 2.2, 2022-09-08 - 45 -...
  • Page 48 Add: No.26-30, South Yongjiang Road, Beilun, 315806, Ningbo, China Tel: +86 (0) 574 8622 8957 Fax: +86 (0) 574 8622 8852 E-mail: service@deye.com.cn Web: www.deyeinverter.com...