Repairs And Replacements; Safety Warning - Disconnection From Power Supply; Safety Warning - Refractory Fibre Insulation; Panel Removal - VERDER CARBOLITE GERO LGP 4/3370 Installation, Operation And Maintenance Instructions

425 c large general purpose oven
Table of Contents

Advertisement

6.0 Repairs and Replacements

6.1

Safety Warning - Disconnection from Power Supply

Immediately switch the product off in the event of unforeseen
circumstances (e.g. large amount of smoke). Allow the product to
return to room temperature before inspection.
Always ensure that the product is disconnected from the electrical
supply before repair work is carried out.
Caution: Double pole/neutral fusing may be used in this product.
6.2

Safety Warning - Refractory Fibre Insulation

Insulation made from High Temperature Insulation Wool
Refractory Ceramic Fibre, better known as (Alumina silicate
wool - ASW).
This product contains alumino silicate wool products in its thermal insulation. These
materials may be in the form of blanket or felt, formed board or shapes, slab or loose
fill wool.
Typical use does not result in any significant level of airborne dust from these
materials, but much higher levels may be encountered during maintenance or repair.
Whilst there is no evidence of any long term health hazards, it is strongly
recommended that safety precautions are taken whenever the materials are handled.
Exposure to fibre dust may cause respiratory disease.
When handling the material, always use approved respiratory protection
equipment (RPE-eg. FFP3), eye protection, gloves and long sleeved clothing.
Avoid breaking up waste material. Dispose of waste in sealed containers.
After handling, rinse exposed skin with water before washing gently with
soap (not detergent). Wash work clothing separately.
Before commencing any major repairs it is recommended to make reference to the
European Association representing the High Temperature Insulation Wool industry
(www.ecfia.eu).
Further information can be provided on request. Alternatively, Carbolite Gero Service
can quote for any repairs to be carried out either on site or at the Carbolite Gero
factory.
6.3

Panel Removal

Control panel:
Unlock the latch and open the hinged doors to gain access to the rear of the control
panel.
18

Advertisement

Table of Contents
loading

Table of Contents