Galvo Shed GVO1515 Assembly Instructions page 3

1.53m l x 1.53m w x 1.98-1.83m h sloping roof garden shed

Advertisement

GVO1515
page 3 -
2: Back Wall
2: Back Wall
You need:
2 x (e) Channels
·
2 x (a) Sheets
·
(e)
3: Roof
You need:
2 x (e) Channels
·
2 x (a) Sheets
·
2 x (i) "L"s
·
4: End Walls
You need:
2 x (f) Channels
·
2 x (b) Sheets
·
(b)
(b)
(f)
(f)
If you choose to vary from these instructions your warranty will be impaired.
(a)
(j)
(e)
(e)
(a)
(e)
(i)
(a)
(f)
Channels will end
20 - 30mm short
at tops of end
walls and 15 - 20
at bottoms
A. Join 2 (a) sheets together with
2 fixings thru the overlapping
ribs making sure the ends of the
sheets are flush.
B. Cap sheeting with (e) chan-
nels .
C. Fix the channels thru the end
ribs and every 2nd rib between.
D. Make sure you put at least 1
fixing per sheet up thru the un-
derside of the channel into the
pan of the sheet.
A. Join 2 (a) sheets together same as
the back.
B. Cap sheeting with (e) 1515mm
channels.
C. Fix the channels every 2nd rib but
not the corners at this stage
D. Place the short flange of (j) the "L"
on top of the rib at 1 end. Make
sure ends are flush with sheeting
and put 1 fixing in the centre to
hold the "L". Fix the corners thru
the channels and 1 more between
the corner and the centre fixing.
Perform the same at the other
end. 5 fixings ea "L"
A. Join 2 Left (b) sheets together
to give a slope at the top.
B. Cap sheeting with (f) 1485mm
channels.
C. Fix the channels through the
end ribs and every 2nd rib be-
tween.
D. Make sure you put at least 1
fixing per sheet up through the
underside of the channel into
the pan of the sheet.
E. Perform the same again for
the Right side.