Figure 4 Electrical wiring overview
Section 4 Set the power to on
1. Make sure that the sensor cables are connect to the sensor.
2. Set the power switch to "ON".
The field transmitter automatically connects to a cellular network.
3. Wait 2 to 3 minutes.
12 English