BLP 1000 Battery lift Maximum Capacity: 1000 kg Description: This lift is uniquely designed for removal and installation of electric vehicle batteries. This product can also be used for removal and installation of various other components, such as: engines, transaxles, fuel tanks, suspensions, cradles, chassis...
Explanation of Safety Signal Words The safety signal word designates the degree or level of hazard seriousness. DANGER: Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. WARNING: Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.
Preparation and Set Up Unpackaging 1. Cut shipping banding from carton and platform. 2. Install lift handle into base frame weldment and secure in place with cotterless hitch pins. 3. Remove the wood chocks from around the caster wheels. 4. Carefully roll the lift off the shipping pallet onto the floor. Prepare The Air Pump For Operation A.
Page 4
Functional Check of Lift Without external load applied to lift platform, fully raise and lower multiple times to ensure proper function of the hydraulic system and scissor components. 1. Press the end of the air pump foot pedal marked to raise the lift platform until it stops at maximum extension.
Page 5
Stabilization Feature If lift is to be used as a stationary work surface for servicing components, two leveler screws (see Figure 2) have been added to help stabilize the platform. When the desired tilt or platform position has been reached, thread both leveler screws inward until they meet the bottom of the platform and tighten finger-tight only.
Operating The Lift To Remove Components 1. Always follow the vehicle manufacturer’s recommended service procedure for removal of the component. 2. Position the lift under the vehicle. Connect the air hose to the air pump. 3. Press the end of air pump foot pedal marked to raise the lift to the load.
Page 7
Preventive Maintenance continued B. Hydraulic Fittings 1. Inspect for leaks. ● Tighten fittings to stop leak. ● Replace fittings if tightening does not stop leak. C. Hose 1. Inspect and replace if found to contain cuts, cracks, or considerable surface wear. D.
Page 8
EXPLODED DRAWING AND LIST OF MACHINE Back Sheet 4 of 7...
Page 10
cable handle cable A-08-01wire tube A-08-02handle fixed base B-01-01armsection B-01-02The connecting rod bushing B-01-03shaft of roller B-01-0Connecting rod seal plate B-02-01connecting rod B-03-01Upper outer connecting rod main body B-03-02Upper outer connecting rod reinforcement sleeve 2 B-04-01shaft of roller B-04-02Upper ear support B-04-03Inner connecting rod stiffener B-04-04Oil cylinder upper ear B-04-05Upper inner connecting rod stiffener...
Page 11
E-02-01fixed plate of safety teeth E-02-02 E-02-02main body of safety teeth B-03-01Upper outer connecting rod main body B-03-02Upper outer connecting rod reinforcement sleeve 2 B-01-02The connecting rod bushing Galta S.r.l. P.I. 04058700248 Via Lombardi, 19 - 36075 Montecchio Maggiore (VI)