Download Print this page

Current GTX PS6 GT1 Installation Manual page 2

Advertisement

Pedestrian 12'' Pixelated Countdown Signal Modules
Installation Steps
Conversion to Half Cycle (if required)
1
Remove plastic end-cap.
2
Remove jumper wire from the unit to allow half cycle counting.
3
Put end-cap back on.
Installation of Pedestrian Module
1
Verify input voltage is within specified range on the back of the LED signal module before installation.
Failure to do so will cause lamp to fail.
2
Open front cover of (customer supplied) traffic signal housing.
Connect the wires to the appropriate terminal block within customer supplied signal housing.
3
Red wire ➔ (+ for Hand),
Brown Wire ➔ (+ for Person),
White wire ➔ (for the neutral).
4
Close front cover of (customer supplied) traffic signal housing ensuring that the module gasket is tight within the
housing.
Plastic end cap
RISK OF ELECTRIC SHOCK
Install unit in enclosure
tested to be suitable for wet
locations only.
LED.com
© 2023 Current Lighting Solutions, LLC. All rights reserved. GE and the
GE monogram are trademarks of the General Electric Company and are
used under license. Information and specifications subject to change
without notice. All values are design or typical values when measured under
laboratory conditions.
Half Cycle
CAUTION
Voltage Rating
TRAF047-LED-Pedestrian-12-inch-Pixelated-Countdown-Signal-Modules-lnstallation-Guide
Installation Guide
Page 2 of 2
(Rev 06/21/23)

Advertisement

loading