Summary of Contents for Air & Allied Sales TOKU DIGGER TCD-20
Page 1
www.air-allied.com.au OPERATOR’S INSTRUCTIONS AND PARTS LIST DIGGER TCD-20 MODEL Symbol Please observe all safety precautions listed below. WARNING: This may cause an accident resulting in injury or death if it is not observed. CAUTION: This may cause injury, damage or trouble to the air tool or equipment if it is not followed. WARNING To reduce risk of injury, everyone using, installing.
Page 2
Safety precaution when using an Air Tool Always obey the law and the safety regulations during work. Always wear proper clothing and use other protective equipment when operating an air tool. WARNING Always wear ear protection to prevent possible ear damage when operating an air tool at high noise level or for a long time.
Page 3
Hose connection WARNING Install the metallic cap of the air hose onto the body of the air tool firmly. The metallic cap will come off and cause the hose to run amuck due to vibration if the metallic cap is used in a loose condition. This will be very dangerous.
Page 4
Operator’s instruction Preparations before operation Check following matters before operation. Compressor Capacity of the compressor is sufficient. Minimum requirement 11hp, 38CFM at 90psig (6.2bar) Whether the drain has been removed. Air Hose Whether there is any damage to the air hose. Whether the size and length is correct. Clean the interior of the air hose using compressed air.
Page 5
Hose Connection Whether there is any dust, or damage to the air connection portion. Whether the air hose is tight enough. Operation guide Maintain good balance on both feet. Keep proper distance from the chisel of the Air Breaker. Never put your hand near the chisel when using the Air Breaker horizontally. Push the Air Breaker against the object firmly using the handle before turning the throttle valve down.
Air consumption at air pressure of 600kPa 1.1 m /min Vibration value (ISO 8662-5) 16.0 m/s User’s Reference Steel ball energy absorber Vibration value in conformity to Directive 2002/44/EC, with steel ball energy absorber of ISO 8662-5. 15.5 m/s In this case, workable time is 50minutes a day.
Page 9
Installation of Muffler (option parts) Put Muffler onto the Digger as shown below drawings. Then tighten Screws and Nuts. (6Points) Tightening Torque:29kgf・cm {3N・m} Screw About 13mm from Cylinder end. About 2mm from Back Head Bolt end. sales@air-allied.com.au Air & Allied Sales (Pacific) Pty Ltd www.air-allied.com.au...
TCD-20 Parts List Exploded View No.6 sales@air-allied.com.au Air & Allied Sales (Pacific) Pty Ltd www.air-allied.com.au...
Page 11
TCD-20 MUST REPLACE 100% Spare Parts Service Chart HIGH WEAR 70% MEDIUM WEAR 50% LOW WEAR 30% NON WEAR 10% SUBJECT TO EXTERNAL DAMAGE Symbol Q'ty Parts No. Description This service chart is a guide to Req. 1 Cylinder 410207010 expectant life of component parts. 1 Piston 410207040 The replacement levels are based on average 1 Valve 410207150 tool usage over a one year period.
Need help?
Do you have a question about the TOKU DIGGER TCD-20 and is the answer not in the manual?