Flame Energy FL027 Installation And Operation Manual page 44

Table of Contents

Advertisement

XVR-I SE Installation and Operation Manual
Note that secondary air tubes (B) can be replaced without removing the baffle board (A).
Important Notes:
The air tubes are identified for placement as follows:
Model
Type of tube
Front ► 37 holes of 0.172"
XVR-I SE
Middle front ► 37 holes of 0.172"
Middle rear ► 37 holes of 0.172"
Rear ► 37 holes of 0.172"
44

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xvr-i se

Table of Contents