Advertisement

Quick Links

Bedieningshandleiding en installatie instructies
Bedienungshandbuch und Einbauanleitung
Manuel d'utilisation et instructions d'installation
Manual de manejo y instrucciones de instalación
Manuale per l'uso e istruzioni per l'installazione
and installation instructions
Operation manual
BOW2512E
25 kgf - ø 110 mm
Copyright © 2019 Vetus b.v. Schiedam Holland
NEDERLANDS
ENGLISH
DEUTSCH
FRANÇAIS
ESPAÑOL
ITALIANO
DANSK
SVENSKA
NORSK
SUOMEKSI
POLSKI
Betjeningsvejledning og installations instruktioner
Bruksanvisning och monteringsinstruktioner
Bruksanvisning og installasjonsinstrukser
Käyttö- ja asennusohje
Instrukcja obsługi oraz instalacji
7
16
25
34
43
52
61
70
79
88
97
020530.08

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BOW2512E and is the answer not in the manual?

Questions and answers

Summary of Contents for Ventus BOW2512E

  • Page 1 Manual de manejo y instrucciones de instalación Käyttö- ja asennusohje Manuale per l’uso e istruzioni per l’installazione Instrukcja obsługi oraz instalacji Operation manual and installation instructions BOW2512E 25 kgf - ø 110 mm Copyright © 2019 Vetus b.v. Schiedam Holland 020530.08...
  • Page 2 Make sure that the user of the vessel is supplied with the owner’s manual. vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 3: Installation Recommendations

    - The electric motor must be positioned in such a way that it is al- We do not advise fitting 2 bow thrusters into one tunnel; this does ways well clear from the maximum bilge water level. not result in doubling the thrust! vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 4 - The bars must be installed so they are perpendicular to the ex- pected waveform. vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 5: Installation Of The Thrust Tunnel

    • Then apply anti-fouling treatment if NOTE: The gaskets supplied are al- required. ready electrically insulated. However the bolts and the shaft need to be fit- ted with insulation material, for exam- ple nylon bushes. vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 6: Installation Tailpiece And Intermediate Flange

    (3 - 3.7 ft.lbf ) fore inserting and tightening them. Check for possible leaks immediately the ship returns to wa- ter. *) A suitable grease is VETUS ‘Shipping Grease’ , Art. code: VSG. vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 7 Outboard Gear Grease Molykote® G-n plus *) A suitable grease is VETUS ‘Shipping Grease’ , Art. code: VSG. vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 8: Electrical Installation

    Instead of a storage battery main switch, a remotely controlled main switch annex emergency stop can be installed. This remotely controlled main switch is available for 12 or 24 Volt DC. Vetus art. code: BPMAIN12 respectively BPMAIN24. vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 9 If a delay is desired where one of the following operating devices is - BPSM, operating panel for side mounting, installed, a delay switch can be installed. - FSxx, foot switch button Delay: Vetus art. code: BPTD vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 10: Troubleshooting

    111. Length of usage: See table on page107 4 min. continuously or max. 4 min. per hour at 220 A (12 Volt).. vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 11: Dimensioni Principali

    Viktigste mål Dimensions principales Päämitat Dimensiones principales Główne wymiary Dimensioni principali 153 (6 “) 209 (8 “) ø 112 “ DIA.) “) “) ø 110 “ DIA.) “) 1 : 10 vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 12: Accucapaciteit, Accukabels

    0 - 37 ft AWG 2 55 Ah - 12 V 70 Ah - 12 V BCI 90 - 500 37 - 47 ft AWG 1 BCI 91 - 650 vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 13 Bleu Azul 2 Rood (+) Red (+) Rot (+) Rouge (+) Rojo (+) 3 Zwart (-) Black (-) Schwarz (-) Noir (-) Negro (-) 4 Wit White Weiß Blanc Blanco vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 14 2 Rosso (+) Rød (+) Röd (+) Rød (+) Punainen (+) Czerwony (+) 3 Nero (-) Sort (-) Svart (-) Svart (-) Musta (-) Czarny (-) 4 Bianco Hvid Hvit Valkoinen Biały vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 15 Dwa przekaźniki pędnika dziobowego (K1 i K2) nie mogą nigdy być siguiente esquema. włączane w tym samym czasie. Z tego powodu w przypadku użycia pedałów nożnych, należy zainstalować dodatkowe przekaźniki, jak przedstawiono na schemacie poniżej. (12 V) vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 16 Schroef compl. met meeneempen en montageset Propeller c/w drive pin and mounting set BP1168 Meeneempen Propeller pin BP1170 Pakking Gasket TS2535E Thermische beveiliging Thermal Protection BP256 Reserve zekering 5 A Spare fuse 5 A vetus® Operation manual and installation instructions bow thruster BOW2512E 020530.08...
  • Page 17 vetus FOKKERSTRAAT 571 - 3125 BD SCHIEDAM - HOLLAND b.v. TEL.: +31 0(0)88 4884700 - sales@vetus.nl - www.vetus.com Printed in the Netherlands 020530.08 2019-08...

Table of Contents