CELSION QUBE Basic Plus User Manual

Safety case for batteries
Table of Contents

Advertisement

Quick Links

As of: September 2023
User Manual
QUBE
- Safety Case
®
for Batteries
Example: QUBE
Premium
®
Serial number:
to be filled in by customer
1

Advertisement

Table of Contents
loading

Summary of Contents for CELSION QUBE Basic Plus

  • Page 1 As of: September 2023 User Manual QUBE - Safety Case ® for Batteries Example: QUBE Premium ® Serial number: to be filled in by customer...
  • Page 3: Table Of Contents

    Table of contents 1. INTENDED PURPOSE 1.1 Intended use 1.2 Warranty 2. FEATURES 2.1 Technical specifications 2.2 Measurements 2.3 Versions 2.4 Scope of delivery 3. SAFETY INSTRUCTIONS 3.1 Icons 3.2 Further information 4. TRANSPORT, INSTALLATION & COMMISSIONING 4.1 General information 4.2 Transport 4.3 Storage and environmental conditions 4.4 Installation...
  • Page 4 6. MAINTENANCE & SERVICING 6.1 General information 6.2 Maintenance schedule 6.3 Visual inspection 6.4 Extinguishing medium tank 6.4.1 General notes 6.4.2 Preparation for maintenance instructions / Important information for mainenance service 6.5 Smoke detector (optional) 6.5.1 Functional test (optional) 6.5.2 Resetting the smoke detector (optional) 6.5.3 Replacing the smoke detector (optional)
  • Page 5: Intended Purpose

    1. Intended Purpose Intended use ® The QUBE safety case is a tested fire protection housing with a fire resistance duration of at least 90 minutes, tested in accordance with DIN EN 1363-1 in the sense of EI90 (<->io), designed for the passive and active storage of primary and secondary batteries with lithium compounds (hereinafter referred to as batteries).
  • Page 6: Measurements

    Measurements View from the right Front View from above – Door opening angle 90° View from above – Door opening angle 180° Fiew from the left ® Example: QUBE Premium If the door opening angle exceeds 180°, the product can be damaged!
  • Page 7: Versions

    Versions versions Basic Plus Premium features automated extinguishing system incl. ● ● pottom pan extinguishing medium tank ● ● triple socket ● ● ventilation system in the charging area ● ● electromechanical closure with protection from external access cylinder lock shutter RFID card / PIN 2-factor authentication possible...
  • Page 8: Transport, Installation & Commissioning

    / consignment note from the freight forwarder. De- fects have to be reported to the seller or the Celsion Brandschutzsysteme GmbH in writing (no later than 5 working days after delivery).
  • Page 9: Storage And Environmental Conditions

    • Store and set up only on firm, level ground • During assembly by authorized employees or partner companies of Celsion Brandschutzsysteme GmbH, it is essential to comply with the instructions and specifications of the installers • On-site installation conditions must be observed Installation 4.4.1...
  • Page 10: Line-Up Vertically

    4.4.3 Line-up vertically (optional) ® 4.4.3.1 Screw connections between the QUBE safety cases required materials ® 1. Align the QUBE safety cases flush at the corners 2. Remove each of the right and left screws from the lower strip of the enclosure opening of the upper safety case 3.
  • Page 11: Back Wall Mounting / Anti-Tilt

    4.4.3.2 Back wall mounting / anti-tilt (optional) Due to the reduced stability, a tilt protection is man- datory for each vertical line-up. The pre-drilled fixing holes in the rear panel must be provided at the ma- nufacturer’s work and can only be made subsequently by our authorised service personnel.
  • Page 12: Line-Up Horizontally

    4.4.4 Line-up horizontally (optional) ® 4.4.4.1 Screw connections between the QUBE safety cases required materials ® 1. Align the two QUBE safety cases and the 41 mm fire protection panel flush with the rear panel 2. Remove the upper and lower screw from the right strip of the left safety case as well as the upper and lower screw from the left strip of the right safety case...
  • Page 13 3. Pre-drill the existing fixing holes with a 4mm drill bit, 60 mm deep 4. Remove the existing drill dust from the hole and screw the fasteners (2 x 2 pieces 4.5 x 60 mm wood construction screws) into the drilled holes Do not overtighten! Since horizontal line-up is usually requested in combination with vertical line-up, point...
  • Page 14: Electrical Installations

    Electrical installations (optional) The electrical installation may only be carried out by a qualified specialist with electrotechnical training or further training who is familiar with the corresponding regulations and possible dangers. Improper installation can damage both the product and all other connected devices. CAUTION! Any work on the safety case must only be carried out in the de-energized state! If the power plug is available - be sure to remove it from the socket! Observe the following five safety rules!
  • Page 15: System Commissioning Of Extinguishing System

    System commissioning of extinguishing system 1. Screw hose adapter including sealing ring into extinguishing medium tank and tighten (30 Nm) 2. Lightly oil the thread and cone of the hose adapter, as well as the thread and sealing cone of the connecting hose 3.
  • Page 16 5. Attach the extinguishing medium tank to the intended retaining bracket with a cable tie 6. Pulling the safety pin of the lever fitting 7. Actuate lever armature ---> Extinguishing system is now under pressure! 8. Insert the locking pin in the pressurized position of the lever armature...
  • Page 17: Settings

    9. Lock the locking pin using the plug-in seal 10. Insert the power plug into the socket Before use, it is advisable to subject the safety case to a detailed visual inspection. Please use our checklist in Appendix A. 5. Settings Card reader with keyboard ®...
  • Page 18: Add / Change /Delete User

    5.1.3 Add / change / delete user ® (QUBE Premium) 1 User ID number # PIN # The ID number is any number between 1 and 2000. Adding a PIN-user The PIN is any number between 0000 and 9999 (except 1234).
  • Page 19: Opening The Closure Unit

    The safety inspections, the small-scale repair services of the fire protection systems and the mandatory biannual visual inspection must be carried out by participants of the Celsion maintenance training or em- ployees of Celsion Fire Protection Systems GmbH on the basis of the required expertise and due diligence requirements.
  • Page 20: Visual Inspection

    The maintenance instructions of the company Celsion, which are valid in each case, apply to the maintenance. An exchange of the extinguishing medium tank is only possible in consultation with Celsion Brandschutzsysteme GmbH. The use of unauthorized extinguishing medium tank may result in a malfunction of the safety case! 6.4.2...
  • Page 21 3. Relieve the squeeze-grip valve ---> extinguishing system is now depressurised 4. With the securing pin lock the squeeze-grip valve in the depressurised position 5. Remove the cable tie 6. Unhook the extinguishing medium tank from the wall bracket...
  • Page 22: Smoke Detector

    7. Attention! A small amount of liquid will leak out in the next step 8. Unscrew the coupling nut of the connection tube 9. Unscrew the tube adapter and seal ring 10. The scheduled maintenance of the extinguishing medium tank can begin Ready for maintenance! Smoke detector...
  • Page 23: Resetting The Smoke Detector

    6.5.2 Resetting the smoke detector (optional) 1. Turn the smoke detector counterclockwise out of the smoke detector base 2. Wait for about 1 minute 3. Turn the smoke detector clockwise into the base 4. If the LED of the smoke detector is missing, you can carry out the commissioning as described in point 4.6 6.5.3 Replacing the smoke detector...
  • Page 24: Card Reader With Keyboard

    7.2.2 Card reader with keyboard ® (QUBE Premium) Operating status Green LED Yellow LED Red LED Beep-tone Switching on the supply voltage lights up Use of keyboard Input successful lights up Input failed Di Di Di Enable programming mode lights up Programming mode is active lights up Exit Programming Mode...
  • Page 25: Incident

    ▷ Decreasing or low pressure display on the pressure gauge of the extinguishing medium tank, insofar as no leaks can be detected on the hose/pressure container ® ▷ Red LED lights up (QUBE Premium) ▷ Superior position detects heat and/or smoke development in the housing (optional) 7.4.3 Incident...
  • Page 26: Manufacturing Declaration

    Please contact customer service 8. Manufacturing Declaration The data used in this manual can be changed at any time by the manufacturer (Celsion Brandschutzsys- teme GmbH) without prior notice or mentioning of reasons. This manual has been prepared with great care, the content has been prepared to the best of our knowledge.
  • Page 27: Appendix

    Current information and notes as well as the general terms and conditions can be found on our website: www.celsion.de Printing errors and mistakes cannot be ruled out. If in doubt, please get in touch with us. If you have any problems, please contact...
  • Page 28 Does the smoke detector, if available, show any damage? Is the smoke detector, if available, still firmly attached to the build plate? Seals Is the door closed tightly? Is the door closed tightly enough to keep dirt out? Is the all-round silver tape on the door undamaged? Is the flexible seal around the door in perfect condition? Function check! If necessary, fix or replace.
  • Page 29 Notes...
  • Page 30 Notes...
  • Page 32 Dresden - headquaters Cäcilienstraße 5 D-01219 Dresden T: +49 (0) 351 / 272046 – 0 F: +49 (0) 351 / 272046 – 29 Email: dresden@celsion.de Bautzen - administration (Visitor and delivery address) Dresdener Straße 51 D-02625 Bautzen T: +49 (0) 3591 / 27078 – 0 F: +49 (0) 3591 / 27078 –...

This manual is also suitable for:

Qube premium

Table of Contents