Download Print this page

ZUCCHETTI ACUABLU ZA5695 Instruction For The Installation

Faucets

Advertisement

Quick Links

I
ISTRUZIONI PER L'INSTALLAZIONE DELLA RUBINETTERIA
GB
INSTRUCTIONS FOR THE INSTALLATION OF THE FAUCETS
F
INSTRUCTIONS POUR L'INSTALLATION DE LA ROBINETTERIE
D
MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN
E
INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA
ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ
RU
PL
INSTRUKCJE INSTALACJI ARMATURY
ZA5695
Zucchetti Rubinetteria S.p.A.
Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it

Advertisement

loading

Summary of Contents for ZUCCHETTI ACUABLU ZA5695

  • Page 1 INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ INSTRUKCJE INSTALACJI ARMATURY ZA5695 Zucchetti Rubinetteria S.p.A. Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it...
  • Page 2 (mm) (mm) 7-12 7-12 13-19 13-19 20-26 20-26 27-33 27-33 34-40 34-40...
  • Page 5 Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art. Z9126P). Should the water pressure be higher than 5 bar, a pressure reducer should be fitted upstream of the supply pipes.