turbionaire TS5GE06T Installation Manual

Advertisement

INSTALLATION MANUAL
TS5GE06T
(RM-1206S-3D/Y5G)
TS5GE09T
(RM-1209S-3D/Y5G)
TS5GE10T
(RM-1210S-3D/Y5G)/
TS5GE12T
(RM-1212S-3D/Y5G)/
TS5GE15T
(RM-1215S-3D/Y5G)/
TS5GE18T
(RM-1218S-3D/Y5G)/
TS5GE20T
(RM-1220S-3D/Y5G)/
Please read these instructions carefully before use.
AIR CURTAINS
TS5GE06M
/
TS5GE09M
/
TS5GE10M
TS5GE12M
TS5GE15M
TS5GE18M
TS5GE20M
Thanks for purchasing this Air Curtain,
(RM-1206S-D/Y5G)
(RM-1209S-D/Y5G)
(RM-1210S-D/Y5G)
(RM-1212S-D/Y5G)
(RM-1215S-D/Y5G)
(RM-1218S-D/Y5G)
(RM-1220S-D/Y5G)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TS5GE06T and is the answer not in the manual?

Questions and answers

Summary of Contents for turbionaire TS5GE06T

  • Page 1 AIR CURTAINS INSTALLATION MANUAL TS5GE06T TS5GE06M (RM-1206S-3D/Y5G) (RM-1206S-D/Y5G) TS5GE09T TS5GE09M (RM-1209S-3D/Y5G) (RM-1209S-D/Y5G) TS5GE10T TS5GE10M (RM-1210S-3D/Y5G)/ (RM-1210S-D/Y5G) TS5GE12T TS5GE12M (RM-1212S-3D/Y5G)/ (RM-1212S-D/Y5G) TS5GE15T TS5GE15M (RM-1215S-3D/Y5G)/ (RM-1215S-D/Y5G) TS5GE18T TS5GE18M (RM-1218S-3D/Y5G)/ (RM-1218S-D/Y5G) TS5GE20T TS5GE20M (RM-1220S-3D/Y5G)/ (RM-1220S-D/Y5G) Thanks for purchasing this Air Curtain, Please read these instructions carefully before use.
  • Page 2: Product Introduction

    1、 PRODUCT INTRODUCTION As one of the new top-class products for modern decoration, air curtain is also matched with the air-conditioner.And it is installed at the entrances of supermarket,theater,meeting room,hotel,office room,working shop and storeroom to prevent the dust,mosquito and nocuous air,and so on.
  • Page 3: Installation

    3.3 Don’t install the unit too low, no less than 2.3 3.4 Don’t install the unit in a place where it is meter from the ground. When the entrance is wider splashed by water, exposed to excessive than the unit, it is recommended to install two or steam, explosive gas or corrosive gas.
  • Page 4 B、Installing on the wooden wall 4.2.1 Fix the mounting plate in the proper 4.2.2 Same as the step 4 of A positions with tapping screw. MOODEN SC REW M OUN TI NG PI ATE C、Hanging from the ceiling 4.3.1 Remove the mounting plate from main body 4.3.2 Fixing ceiling brackets as Fig.
  • Page 5 D、For above ceiling 4.4.1Fix the air curtain as in the procedure for installing on the concrete wall. 4.4.2 Then pipe as right Fig. Instructs. 5、HEATED MODEL TECHNICAL PARAMETER Heater Diam Volt. Max.air Air volume Motor power Noise(db) /Freq. Temp. speed(m/s) MODEL power weight...
  • Page 6: Operation

    BLUE(BROWN/RED) BLUE(BROWN/RED) (YELLOW) (YELLOW) THERMAL CUT-OUT THERMAL CUT-OUT RECEIVER RECEIVER ORANGE ORANGE THERMAL CUT-OUT THERMAL CUT-OUT MOTOR MOTOR YELLOW YELLOW RECEIVER RECEIVER HEATER HEATER THERMAL CUT-OUT THERMAL CUT-OUT HEATER HEATER BROWN BROWN GREY GREY BLUE BLUE WHITE WHITE YELLOW-GREEN YELLOW-GREEN 6、OPERATION 6.1.
  • Page 7 6.2. Controlled by the control panel in the unit is the same function as 6.1. 6.3. Overheat protection: When the air curtain works at heating mode, there is overheat protection. When the heater temperature is overheating, heating mode will stop and switch to cool mode automatic, at the same time the indication light change to green light.

This manual is also suitable for:

Ts5ge09tTs5ge10tTs5ge12tTs5ge15tTs5ge18tTs5ge20t ... Show all

Table of Contents