Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Steketee Manuals
Farm Equipment
EC-RIDGER 7
Operating instructions manual
Steketee EC-RIDGER 7 Operating Instructions Manual
Hide thumbs
1
2
Table Of Contents
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
page
of
98
Go
/
98
Contents
Table of Contents
Troubleshooting
Bookmarks
Table of Contents
Table of Contents
About These Instructions
Introduction
Target Groups
Applied Symbols
Design of Warning Signs
Signal Words and Hazard Statements
Warning of Property Damage
Other Notices and Information
Symbols and Text Markings
Direction Specifications
Further Applicable Documents
Safety
Intended Use
Personnel Qualification Requirements
Hazardous Areas
Workplaces and Passengers
Technically Perfect Condition
Safe Handling
Personal Protective Equipment
Driving the Tractor-Machine Combination
Safety Devices and Labels
Design and Description
Machine Overview
Machine Safety
Meaning of the Labels
Safety Devices
Type Plate
Headstock
Wheels and Rollers
Hoeing Elements
Tools
Attaching
Checking Suitability of the Tractor
Preparations on the Tractor
Mounting the Machine
Road Travel
Information on Road Travel
Preparing for Road Travel
Operation
Basic Procedure
Basic Operation
Lifting and Lowering the Hoeing Elements Mechanically
Lifting and Lowering the Combi-Element Hydraulically
Changing the Setup State
Replacing the Toolbar - EC-Ridger 9
Adjusting the Machine
Required Adjustments Prior to Operation
Aligning the Hoeing Machine with Support Wheels
Aligning the Hoeing Machine Without Support Wheels
Checking and Adjusting Distances of the Hoeing Elements
Selecting and Adjusting Tools
Adjusting the Working Depth of the Hoeing Elements
Test Run
Working with the Machine
Cleaning and Care
After Working in the Field
Cleaning with High-Pressure Cleaner
Detaching
Preparing Detaching
Detaching the Machine
Maintenance and Repair Work
Maintaining the Machine Properly
Preparations
During the Maintenance and Repair
Maintenance
Maintenance Schedule
Tractor Connection
Frame
Checking Safety Devices
Hydraulics
Electrics
Soil Working Tools
Lubricating
Lubrication Schedule
Lubricating Components Via Grease Nipples
Grease Components
10 Troubleshooting and Error Correction
Find and Eliminate Errors Correctly
Prior to Troubleshooting at the Implement
When Troubleshooting and Eliminating Errors
Error - Cause - Remedies at a Glance
Shutdown and Disposal
Shutdown
Disposal
Technical Data
Dimensions
Machine Weights
Performance Data
Connection Data
Electrical Connections
Hydraulic Connections
Noise, Airborne Sound
Operating Materials
Tyres and Wheels
Connecting Equipment at the Implement
Index
Appendix
A Tightening Torques
B Calculating the Axle Load and Ballasting for Mounted Implements
C Cross Shaft Overview
Advertisement
Quick Links
Download this manual
OPERATING INSTRUCTIONS
HOEING MACHINE
EC-RIDGER
en-GB | Item no. 17515198 | BA 00/02.2021
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the EC-RIDGER 7 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Steketee EC-RIDGER 7
Farm Equipment Steketee EC-WEEDER Operating Instructions Manual
(138 pages)
This manual is also suitable for:
Ec-ridger 9
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the EC-RIDGER 7 and is the answer not in the manual?
Questions and answers