Summary of Contents for Opal Energy Power Lite L051100-A1
Page 1
Power Lite L051100-A1 Lithium Battery System User Manual Ver 1.3 OPAL Energy Pte Ltd www.opalenergy.com.sg I Tel: +65 6515-4780...
Page 2
OPAL ENERGY PTE LTD, and its licensors. This material may not be modified, reproduced or copied, in whole or in part, without the prior written permission of OPAL ENERGY PTE LTD, and its licensors. Additional information is available upon request. The following are trademarks or registered trademarks of OPAL ENERGY PTE LTD.
Page 3
Lite installation and service require knowledge of high voltage electricity and should only be performed by OPAL ENERGY Certified Installers. OPAL ENERGY assumes no liability for injury or property damage due to repairs attempted by unqualified individuals or a failure to properly follow these instructions.
Page 4
WARNING: Do not attempt to open, disassemble, repair, tamper with, or modify power Lite. power Lite and its components are not user serviceable. Batterycells in power Lite are replaceable. Contact the OPAL ENERGY Certified Installer who installed the system for any repairs.
Page 5
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 CAUTION: Do not paint any part of power Lite, including any internal or external components such as the exterior shell or casing. CAUTION: Do not connect power Lite directly to photo voltaic (PV) solar wiring.
1.2. Safety Precautions OPAL Energy products are designed with full consideration of safety. However, all electrical appliances can be dangerous if used inappropriately; it can cause a fire or electric shock that leads to severe injury or death. For your protection, please read these safety precautions thoroughly.
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 If you ignore these instructions, it can lead to electric shock or other Caution accidents causing injury or harm to nearby products. Warning If you do not follow the instructions below, it can lead to a fire or electric shock causing serious injury or death.
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 Prohibited Wear insulating gloves and protection glasses during installation and connection of the set to prevent electric shock or other injuries. Keep Dry Do not allow water and/or foreign objects inside the module Water or foreign objects inside the module can cause a fire or electric shock.
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 ◼ Instruction Install based on the designated way of installation. If you do not follow the designated way of installation, the set may drop due to the installations lack of stability and can cause injury.
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 Danger If liquid is leaking from the module, observe the following measures. Do not allow the liquid to come in contact with skin or clothing. ◼ If the liquid comes in contact with skin or clothing, wash thoroughly with plenty of water.
L051100-A1 Energy Storage System is consisted of 2 sets of 1P8S battery modules manufactured by OPAL Energy. In each battery module , there are 8 pcs of 100 Ah LFP cell originated from CATL. The overall system also provides standard communication port, i.e. CAN and RS485, to monitor the working status and communicate with computer as well as the Power Conversion System (PCS).
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 2.2. Dimensions L051100-A1 dimensions are presented in Figure 2. It is well designed for 19 inch cabinet. Figure 2 - L051100-A1 Dimension 2.3. Specifications Specifications of L051100-A1...
∆V>3V , please Dis/Charge the batteries to meet ∆V≤3V, or consult our engineers; 2.4. Installing Instructions Instructions for installing the battery must be followed. (Refer to your distributor OPAL Energy support in case of doubt) 2.4.1. Definition of internal Sampling Connector -CON1 Wire No.
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 Item Name Model Remarks SOC LED x4 Alarm LED operation LED Dialer switch Communication port RJ45 CAN To PCS, RS485 Internal Connection Communication port *2 RJ45...
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 3. Installation 3.1. Unpacking inspection ◼ When the equipment arrives at the installation site, loading and unloading should be carried out according to the rules and regulations, to prevent from being exposed to sun and rain.
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 3.3.1 Material List Plug Isolation Cap Tail-hood 3.3.2 Steps Put wire through isolation cap and Tail-Hood. 3. remove outer isolation layer of DC cable according to...
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 3.4.2 Multi-Units in Parallel (4 units as an example) Figure 6 - Multi-Units Connection-1 ( Battery ∆V should be less than 3V at first Parallel installation ) Figure 7 - Multi-Units Connection-2 ( Battery ∆V should be less than 3V at first Parallel installation )
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 Master Pack and Slave Pack L051100-A1 can be used as single unit as well as multi-units (in parallel) mode. The customer must inform supplier if multi-units mode is required. The Master Pack can be used individually, but Slave Pack cannot be used individually.
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 4. Power ON and OFF 4.1. Instruction Please double check the Precautions for use in section 1.3. 4.1.1 System Power ON ◼ Installation (including DC cable, communication wire connection and dialer switch) is properly installed and set up.
OPAL ENERGY PTE LTD 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966 4.1.5. System Status Instruction There are 6 LED indicators, 4 green LED gives status of SoC (charging state), 1 red Alarm LED and 1 green Running Status LED (ALM: indicating charging/ discharging mode etc.)
Page 26
It is forbidden to expose the battery of serious vibration and shock during transportation. 5.2. Storage If the system is not in use, the system must be properly stored. Otherwise, if any issues, OPAL Energy shall not be liable. Storage Conditions: ◼...
Page 27
OPAL Energy Pte Ltd www.opalenergy.com.sg I Tel: +65 6515-4780...
Page 28
6. Disclaimer It should be noted that OPAL Energy shall not be liable if any materials are added to this user’s manual without further inform of customers. OPAL Energy Pte Ltd Add: 18, Boon Lay Way, #06-107, Trade Hub 21, Singapore 609966...