Page 1
Barn Door Trolley Kit 4310485 W-KIT-1-BK-1PC Installation Manual Iron Black Table of Contents Door Stop 1 Door Stop 2 -If Door Stop 1 is included with your kit, please start on Page 2 -If Door Stop 2 is included with your kit, please start on Page 6...
Page 2
Barn Door Rail Kit 4310485 W-KIT-1-BK-1PC Installation Manual Iron Black Parts Included Lag Screw Floor Anchor Door Stop Front SS-10.1006 SS-10.1011 ss-10.1236 Waylon Bolt (M10-1.5 x 50) 1-1/4” Screw Trolley SS-10.1077 SS-10.1012 Door Stop Rear SS-20.1059 ss-10.1239 Wall Anchor 3/4” Screw SS-10.1002...
Page 3
Planning (continued) Door Trolley Top Door to Bypass Trolley Bolt Door Thickness to Rail Rail Center Clearance Clearance Clearance Clearance (1) (3) ” 6” ” ” ” ” ” 1” 6” ” ” ” ” ” Allow at least 3/4” clearance above the trolley. The nominal distance with the door hung to run vertical and the wall straight and plumb.
Page 4
2 - Mount the Rail (Continued) IMPORTANT The widest part of the Spacer should be placed on the wall. Place a Lag Screw through the hole in the Rail aligning with the outermost pilot hole on one side, through a Spacer, and drive the Lag Screw into the pilot hole.
5 - Install Door Guides and Secure Door Stops Locate the Door Guides on either side of the door, as close to the doorway as possible. See the diagram for proper spacing. ” Screw Door If the floor is not solid Thickness (T) wood, it may be Floor...
Page 6
Barn Door Rail Kit 4310485 W-KIT-1-BK-1PC Installation Manual Iron Black Parts Included Lag Screw SS-10.1006 Wall Anchor Nut (M10-1.5) SS-10.1002 SS-10.1010 Door Stop Door Guide SS-10.1005 SS-10.1013 Floor Anchor Spacer SS-10.1011 SS-10.1007 Waylon Trolley Bolt (M10-1.5 x 50) 1-1/4” Screw SS-20.1059...
Page 7
Planning (continued) Door Trolley Top Door to Bypass Trolley Bolt Door Thickness to Rail Rail Center Clearance Clearance Clearance Clearance (1) (3) ” 6” ” ” ” ” ” 1” 6” ” ” ” ” ” Allow at least 3/4” clearance above the trolley. The nominal distance with the door hung to run vertical and the wall straight and plumb.
Page 8
2 - Mount the Rail (Continued) IMPORTANT The widest part of the Spacer should be placed on the wall. Place a Lag Screw through the hole in the Rail aligning with the outermost pilot hole on one side, through a Spacer, and drive the Lag Screw into the pilot hole.
Page 9
5 - Install Door Guides and Secure Door Stops Locate the Door Guides on either side of the door, as close to the doorway as possible. See the diagram for proper spacing. ” Screw Door If the floor is not solid Thickness (T) wood, it may be Floor...