EpiSensor ZEM-63 Install Sheet

Wireless 3-phase electricity monitor

Advertisement

Quick Links

Voltage References & Current Transformer Wiring Diagram (4-wire WYE)
Auxiliary Mains Supply
By default, the ZEM is powered from a single-phase supply taken from voltage references L1 and N. To power the ZEM from an Auxiliary Mains Supply (85 - 480VAC ± 10%)
first remove shorting links J8 and J9. Important: Use a fused disconnect or circuit breaker (not supplied) according to local electrical regulations (min. 500mA).
to Auxiliary Mains Supply
IMPORTANT: Remove
shorting links J8 and J9
before connecting an
auxiliary mains supply!
AuxL
Auxiliary Mains
Supply Terminals
AuxN
PE
L1
Voltage Reference
L2
Terminals
L3
Ref
IMPORTANT: must be
installed in orientation
shown
Important: Fused disconnect
or circuit breakers (not
2
supplied) to protect 0.75mm
conductor according to local
electrical regulations (min.
500mA)
3-Phase
Supply
L1
Shorting Links
CT3
CT2
CT1
-
-
-
+
+
+
Note: Insulation colours for
CT / Rogowski coil cables
can vary
Configuration: 4 WIRE WYE
ANSI Meter Form: 9S/16S
Inputs: 3 x Vref, 3 x CT
Note: configure ZEM on Gateway for 9S/16S
L3
CT3
Phase C
CT1
Phase A
N
Neutral
CT2
Phase B
L2
Install Sheet
ZEM-63
//
Wireless 3-Phase Electricity Monitor
Document Ref. EPI-222-00
HAZARD OF ELECTRIC SHOCK,
EXPLOSION, OR ARC FLASH
NEVER work alone.
Use appropriate personal protective equipment (PPE) and follow safe electrical work practices.
Only qualified electrical workers should install this equipment. Such work should be performed only after
reading the entire set of installation instructions.
If the equipment is not used in a manner specified by EpiSensor, the protection provided by the equipment
may be impaired.
Before performing visual inspections, tests, or maintenance on this equipment, disconnect all sources of
electric power. Assume that all circuits are live until they have been completely de-energized, tested, and
tagged. Pay particular attention to the design of the power system. Consider all sources of power, including
the possibility of backfeeding.
Turn off all power supplying the meter and the equipment in which it is installed before working on it.
Always use a properly rated voltage sensing device to confirm that all power is off.
Before closing all covers and doors, inspect the work area for tools and objects that may have been left
inside the equipment or panel.
When removing or installing metering or other equipment, do not allow it to extend into the energised bus.
The successful operation of this equipment depends upon proper handling,
Neglecting fundamental installation requirements may lead to personal injury as well as damage to
electrical equipment or other property.
Before performing Dielectric (Hi-Pot) or Megger testing on any equipment in which the energy meter is
installed, disconnect all input and output wires to the energy meter.
High voltage testing may damage electronic components contained in the meter.
Failure to follow these instructions will result in death or serious injury.
Installation & Safety Notes
EpiSensor equipment should be installed, operated, serviced and maintained only by qualified personnel.
EpiSensor does not assume any responsibility for any consequences arising out of the use of this
equipment.
The ZEM voltage measurement inputs are rated for up to 277 V L-N or 480 V L-L. For any voltage
exceeding 277 V L-N, an auxiliary power source must be used. Consult the ZEM-63 datasheet for more
information on available product variants. For voltages exceeding 480 V L-L, a voltage transformer must
be used.
Fuse for neutral terminal is required if the source neutral connection is not grounded.
Clearly label the device's disconnect circuit mechanism and install it within easy reach of the operator.
The fuses / circuit breakers must be rated for the installation voltage and sized for the available fault
current.
Depending on the type of current transformers used with the EpiSensor ZEM, shorting links may be
required. Please consult the user guide for more information.
If Voltage Transformers are used, the VT ratio setting should be adjusted on the ZEM settings page on the
Gateway.
ZEM's using Rogowski coil or milliamp Current Transformers are individually calibrated and the current
transformer cables should not be extended or interchanged.

Advertisement

loading
Need help?

Need help?

Do you have a question about the ZEM-63 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for EpiSensor ZEM-63

  • Page 1 ➔ If the equipment is not used in a manner specified by EpiSensor, the protection provided by the equipment may be impaired. ➔ Before performing visual inspections, tests, or maintenance on this equipment, disconnect all sources of electric power.
  • Page 2 ➔ If the equipment is not used in a manner specified by EpiSensor, the protection provided by the equipment may be impaired. ➔ Before performing visual inspections, tests, or maintenance on this equipment, disconnect all sources of electric power.
  • Page 3 Only qualified electrical workers should install this equipment. Such work should be performed only after reading the entire set of installation instructions. ➔ If the equipment is not used in a manner specified by EpiSensor, the protection provided by the equipment may be impaired. ➔...
  • Page 4 Install Sheet Installation Checklist ZEM-63 Wireless 3-Phase Electricity Monitor Document Ref. EPI-222-00 Input Voltage If the mains power supply of the ZEM is powered directly from the 3-phase voltage reference, ensure that the voltage does not exceed 480V AC L-L Enclosure Contamination &...