Installation - Glacier bay FARRINGTON 20173-0710H Use And Care Manual

Table of Contents

Advertisement

Available languages

Available languages

Installation

1
Marking the mounting location
Remove the set screw (DD) from the base of the
product post.
Place the product in the desired mounting
location, using a level to position it accordingly,
and use a pencil to lightly mark the outline of the
post(s).
Center the mounting bracket (BB) within the
marked post location(s), and mark where the
screw holes will be drilled.
Repeat this step as needed for each bath
accessory.
NOTE: The included template (EE) may be used to mark the
mounting locations for the towel bar: A and C for the 18
in. towel bar, A and D for the 21 in. wall mount towel rack.
3
Installing the product
Place the post (A, C) over the mounting
bracket (BB) and secure it with the set
screw (DD), as shown.
Repeat this step for the remaining
post (A, C).
NOTE: Ensure the towel bar (B or D) is inserted prior to
securing the second post (A, C) to the mounting
bracket (BB).
DD
BB
5
Please contact 1-855-HD-GLACIER for further assistance.
2
Installing the mounting brackets
Drill 1/4 in. holes in the previously marked
locations.
Push the plastic anchors (CC) flush into the dry wall
or tile.
Fasten the mounting bracket (BB) to the wall with
the wood screws (AA).
Repeat this step as needed for each bath
accessory.
NOTE: When mounting the products to a wood wall, fasten
the mounting brackets (BB) to the wall using the wood
screws (AA). There will be no need for drilling or plastic
anchors (CC).
BB
HOMEDEPOT.COM/GLACIERBAY
CC
AA
BB
AA
BB
DD

Advertisement

Table of Contents
loading

This manual is also suitable for:

Farrington 20173-0110h10045371751004569419

Table of Contents