NADDOD N6400H/N6300/N6100 Series Ethernet Switches Installation Instruction Manual...
Page 2
NADDOD, and may also contact the headquarters of the Company directly. Where readers face any problem about the products of NADDOD , or intend to learn more about other relevant products of the Company, they may contact us by the following ways: Website of the Company: http://www.NADDOD.com/...
Page 3
N6400H/N6300/N6100 Series Installation Guide Preface Preface Introduction This file introduces NADDOD N6400H/N6300/N6100 series Ethernet switches from such perspectives as product introduction, installation instruction, start after being powered on, fault maintenance. Product version The product version corresponding to this file is shown as follows.
Page 4
Content such as warning and prompt adopts regular script. Regular script Lucida Console The output information on the screen adopts Lucida Console form. In addition, the information input by users from the terminals among the output information on the screen adopts bold font. NADDOD Pte. Ltd.
Page 6
7.1 Loading failure handling ..........................22 7.2 The user password is lost ..........................22 7.3 Fault handling of power system ........................24 7.4 Fault handling of configuration system ......................24 7.5 The terminal doesn’t show fault handling ....................... 24 NADDOD Pte. Ltd.
Page 7
N6400H/N6300/N6100 Series Installation Guide Contents NADDOD Pte. Ltd.
NADDOD N6400 series Ethernet switches are new generation high-performance core/aggregation switches launched by NADDOD for cloud data center adhering to the open principle. Adopting modular design and with 4 interface card slots, N6400H switches support 128 100GE ports to the greatest extent and device management based on OpenBMC.
(4): Indicator light of QSFP28 ports (5): Management Ethernet port (MGMT) (6): RJ45 Console port (CON) (7): Indicator light of ID (for locating switch) (8): SYS Indicator light of system (9): USB port (10): Front-rear air intake ports NADDOD Pte. Ltd.
(6): UID indicator light (7): USB port (8): MGMT port (9): Console port (10): Ground screws (11): indicator light of FAN status (12): Fan modules (13): PSU (14): Electro-static dissipative (ESD) belt jack socket (15): Extractable information label 1.3.2 N6300-32C NADDOD Pte. Ltd.
(4): Electro-static dissipative (ESD) belt jack socket (5): MGMT management port (6): Console port (7): USB port 1.3.4 N6100-48X8C Figure 1-9 Diagram of rear panels of N6100-48X8C (1): Ground screws (2): AC Power supply (PSU1) (3): AC Power supply (PSU2) (4): Fan modules NADDOD Pte. Ltd.
RJ-45-to-DB-9. It’s recommended to use the additionally donated random network cables. Figure 1-10 DB9 to RJ45 console interface connection cables Refer to the following form for specific pins: RJ45 Signal Direction DB-9 NADDOD Pte. Ltd.
Page 15
Connector type RJ45 Port Support 10/100M rate self-adaption transmission Support full-duplex/half-duplex working mode auto-negotiation rate MDI/MDI-X self-adaption Specification Twisted-pair of class 5 and above of cables used Maximum 100m transmission distance Standards met IEEE 802.3 NADDOD Pte. Ltd.
Because there exist differences among USB devices from different manufactures in compatibility and driving, NADDOD doesn’t ensure that the USB devices from all manufactures can be used normally on the switches. If a USB device fails to be used normally, it doesn’t belong to switch fault.
MGMT Green solid Port links up, working in 100/1000M mode Green blinking Port works in 100/1000M mode, and has data receipt and sending Dark Port isn’t connected to the network cables or the port doesn’t link NADDOD Pte. Ltd.
Port works in 40G mode and links up N6400H -M28X8C Yellow blinking Port works in 40G mode and has data receipt and sending line card: Start phase Yellow solid, the operating system is powered on by power 29-36 supply to finish initialization NADDOD Pte. Ltd.
Page 19
N6400H/N6300/N6100 Series Installation Guide Product Introduction Name State Instruction indicator light N6300-32C: Dark Not connected to the network cables or the port doesn’t link up 1-32 N6300 -48Y8C: 49-56 N6100 -48X8C: 49-56 NADDOD Pte. Ltd.
Confirm that the cabinet and workbench are solid enough, and can bear the weight of switch and its installation accessories. Confirm that the cabinet and workbench are grounded properly. To ensure long-term stable work of switch, the installation place should also meet the following several NADDOD Pte. Ltd.
Page 21
Harmful gases, such as SO2, H2S, NH3 and Cl2 shall be kept away from the machine rooms. Form 2-3 Limit values of harmful gases in the machine room Gases Maximum values (mg/m3) Sulfur dioxide SO Sulfuretted hydrogen H 0.006 NADDOD Pte. Ltd.
(1) shows. Aign with the guide post at the rear end of the guide rail and the hole of the cabinet column, push into the guide rail in the direction of arrow as (2) shows, release the lock, and make the NADDOD Pte. Ltd.
Page 24
Repeat step 1 and 2 to complete the installation of another guide rail. The rails must be locked by the attached screws, shown as below: Installing Floating nuts Install the front post at the left and right ear screw holes in the rack. NADDOD Pte. Ltd.
Page 25
Step 2: After the switch is fully pushed into the cabinet, secure the screws of the left and right ears of the switch, As shown in the following figure。 After the switch is fully pushed into the rack, fix the screws of the left and right ears of the switch, as shown below. NADDOD Pte. Ltd.
(3) Install the floating nuts of rear column to the hole sites at the top and in the middle; if L-shape bracket has been installed in the cabinet, there’s no need to install it. NADDOD Pte. Ltd.
Page 27
Instruction: If L-shape brackets have been installed in the cabinet, place the switch horizontally on the L-shape brackets, push the switch backwards slowly until the mounting brackets on both sides touch the front column of cabinet, as shown in the following diagram: NADDOD Pte. Ltd.
Push in the power supply module smoothly and steadily along the power supply slot until the power supply module is completely connected to the chassis. 4. Fix the power supply to the switch with the fixing device of power supply. NADDOD Pte. Ltd.
(5) Hold the handle of power supply module with one hand while pressing the fixing device, and press the top of the switch with the other hand. (6) Pull out the power supply module smoothly along the power supply slot. Figure 2-3 Disassembly diagram of power supply module NADDOD Pte. Ltd.
The ground wires of Ethernet switches should be connected to the machine room of switch and grounded, and grounding connections through firefighting artery and lightning rod are incorrect. NADDOD Pte. Ltd.
Page 31
N6400H/N6300/N6100 Series Installation Guide Installation Instruction Figure 2-4 Installation diagram of ground wires of switches, N6400H, N6300-32C, N6300-48Y8C, N6100-48X8C by sequence. Instruction: (1): The ground terminal of switches (2): Protective ground cables NADDOD Pte. Ltd.
Page 32
The ground wire connection position and grounding in the machine room shown in the diagram are only for reference, please connect based on the actual situation of devices. NADDOD Pte. Ltd.
N6400H/N6300/N6100 Series Installation Guide First power-on and start the switch First power-on and start the switch 3.1 Build configuration environment and connect cables NADDOD Pte. Ltd.
The specific methods are as follows: Click the “Start Menu Programs Accessories Communications Hyperterminal”, enter the window of hyperterminal, and creat a new connection. The system will pop up the connection instruction interface as shown in the figure. NADDOD Pte. Ltd.
Page 35
“bits per second” may be described as the “Baud rate”; and the “data flow control” may be described as “traffic control”.) After setting the parameters of serial port, click the button of “OK”, the system will enter the hyperterminal interface shown in the following figure. NADDOD Pte. Ltd.
Page 36
(as shown in the following figure), select the terminal simulation as VT100 there, and click the button of <OK> after finishing the selection. Figure 3-5 Setting of terminal simulation in the window of property settings NADDOD Pte. Ltd.
Click the button of “Quick Connect” to enter the window of quick link. Figure 3-6 Create a quick connection Select the “Serial” protocol. Figure 3-7 Serial port protocol setting Serial port number used by the PC (taking COM4 as an example). NADDOD Pte. Ltd.
Page 38
Use the serial port to connect to PC, you can see CLI shown in the following figure when you press the Enter key on the PC. Figure 3-9 Serial port display window Please use the cables attached in the box, otherwise it may be incompatible. NADDOD Pte. Ltd.
Enter the command, configure the Ethernet switch or check the operational state of Ethernet switch. May enter “?” at any time for help, and please refer to the command line manual or configuration manual for specific configuration command. NADDOD Pte. Ltd.
Parameters Boundary dimension (mm) 470 (width) ×448 (depth) ×43.5 (height) The maximum power consumption of switch Up to 550W × 2 Weight (kg) Working temperature (℃) 0~45 Working humidity 10%~90% RH, incondensable Alternating current Nominal voltage (V) NADDOD Pte. Ltd.
The maximum power consumption of switch Up to 550W × 2 Weight (kg) Working temperature (℃) 0~45 Working humidity 10%~90% RH, incondensable Alternating current Nominal voltage (V) input voltage (AC) Voltage range (V) 115~240 (50Hz/60Hz) Form 4-4 Parameters of N6100-48X8C NADDOD Pte. Ltd.
OS system upgrade of the switch here, therefore, we should enter by selecting “ONIE” and pressing the Enter key. After entering ONIE system, there will be operation options of OS system of the switch as shown in the following figure: NADDOD Pte. Ltd.
Page 43
Rescue Mode will automatically acquire management IP address through DHCP as shown in the following figure: After acquiring the IP address of management port, carry out the upgrade of OS system of switch through the following command. NADDOD Pte. Ltd.
Page 44
And then, the switch will run new OS version of switch. After the upgrade of ONIE system, the license stored in flash and the image in boot will be cleared. Please contact aftersales personnel to acquire license. NADDOD Pte. Ltd.
After copying the new software Image files to the designated folder of switch, you may use the command boot to set the image as the software Image to be used by the switch after the next restart. Switch(config)# boot system flash:/boot/N6300-10.001.003.10B.bin NADDOD Pte. Ltd.
Page 46
* 2011-05-28 10:08:38 10.001.003.10B N6300-10.001.003.10B.bin Among these accessed image files of software, those marked with the asterisk * ahead are the software system mirror image of operating system to be loaded after the next restart of switch. NADDOD Pte. Ltd.
Step 1. Restart the system, press the upward or downward key to select “ONIE” when the following interface appears, and press the Enter key to enter Step 2. Press upward or downward key again to select rescue, and press the Enter key NADDOD Pte. Ltd.
Page 48
5. Press down the “Esc” key after correction, and then enter “:wq” to store configuration; 6. Return to the ONIE interface again to enter the following commands: ONIE:/mnt/flash # cd / ONIE:/ # sync NADDOD Pte. Ltd.
(e.g., hyperterminal). Please confirm the settings of parameters of terminal (e.g., hyperterminal): the Baud rate set as 115200, the data bits as 8, the odd-even check as none, the stop bits as 1, the traffic control as none, and the terminal simulation selected to be VT100. NADDOD Pte. Ltd.