Download Print this page
DAE CC2030 Installation Manual

DAE CC2030 Installation Manual

Cloud metering gateway

Advertisement

Quick Links

Cloud Metering Gateway
CC2030
Installation Guide
1
Warnings & Precautions
Danger
To prevent the risk of electric shock, turn
off all sources of electrical power to the
device during installation or wiring.
Warnings
●Install only by a qualified and trained personnel.
●Follow these instructions accordingly,
otherwise damage may occur to the device.
●Follow electrical rules and regulations in
the selection of wire materials and gauges.
●Avoid having oil, water, metallic powder or
other foreign substances enter the device.
●Avoid using the device in environments
where it will be exposed to steam, corrosive,
or flammable substances; which can cause
short circuits, fires, or explosions.
2
Description
1. CC2030 : The gateway for DAE Cloud
Metering-Water,Electricty
2. DAE Server : meter.iotems.net
3
Dimension
9.5
130
35
CC2030
65
CC2030
H/W :
H1.0.1
MAC :
02:81:AO:26:11
3.0
F/W :
A01
S/N :
2019 S 22000432
Front
Side
Unit : mm
CC2030-v3.0 installation guide-1.2us_P1
4
Installation
V3.0
1. View
Reserved
Reserved
RS485 to meters
Meter Communication
Status Indicators
Power Input
2. Mounting
35mm
DIN Rail
TS35/7.5 or 15
1
1.Hook onto the DIN rail
2
2.Push towards the wall
CC2030
CC2030
H/W :
H1.0.1
MAC :
02:81:AO:26:11
3.0
F/W :
A01
S/N :
2019 S 22000432
3. Wiring
Power
Supply
DC12-24V
Communication Cable
1.Shielded twisted pair UL2464 cable,
24 AWG recommended.
2.Wire ends should be terminated with either
a cord end terminal or blade terminal.
3.Make certain that the wire is screwed securely
to the terminal.
4.Check that the positive (+) and negative
(–) terminals are properly connected.
Reserved
Ethernet Port
Status LEDs
Reserved
Input Power
1.Use the wire size and type as directed by electrical
regulations
2.Make sure that the wire and terminal are making
good contact and tightly screwed.
3.Terminal may only accept wire sizes up to 12 AWG
4.Make sure that the polarity is correct.
DC12-24V
+
Cord end terminal
Recommended
+
-
Power
Supply
DC12-24V
Wiring Detail :
Cord end terminal
recommended
R e d (+)
Wh i te (–)

Advertisement

loading

Summary of Contents for DAE CC2030

  • Page 1 TS35/7.5 or 15 DC12-24V − Cord end terminal Description Recommended Power Supply DC12-24V 1. CC2030 : The gateway for DAE Cloud Power Metering-Water,Electricty 1.Hook onto the DIN rail Supply DC12-24V 2.Push towards the wall 2. DAE Server : meter.iotems.net Communication Cable Wiring Detail :...
  • Page 2 DC12-24V White- Shielded twisted pair UL2464 cable must be different. 2.Each CC2030 can connect up Make sure that the polarity is properly observed. to 20 meters Connecting Online Step 1 : Test that the network port to be used can connect online...