Spectrum SPB 5L14.4 Installation And Operational Manual

Spectrum power station

Advertisement

Quick Links

Sealed Performance Batteries
1 Ant Road, Yatala
Queensland, 4207
Tel:
1300 001 772
SPECTRUM POWER STATION
INSTALLATION and OPERATIONAL GUIDE
SPECTRUM BESS Installation Manual
V2.1 – 22 Feb 23
1 |
P a g e

Advertisement

Table of Contents
loading

Summary of Contents for Spectrum SPB 5L14.4

  • Page 1 Sealed Performance Batteries 1 Ant Road, Yatala Queensland, 4207 Tel: 1300 001 772 SPECTRUM POWER STATION INSTALLATION and OPERATIONAL GUIDE SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 P a g e...
  • Page 2: Table Of Contents

    SERVICING THE AIR FILTERS ......................13 LUX INVERTER PORTAL AND SMART PHONE APP ................. 14 LUX Inverter – Pairing of Wi-Fi Dongle to Router ................. 15 SPECTRUM CABINET - SINGLE LINE DIAGRAM ................17 WARRANTY..........................18 SPECTRUM BESS Installation Manual V2.1 –...
  • Page 3: Spectrum Power Station Overview

    (BESS) designed for hybrid application. The purpose of this guide is to provide installation and operational procedures for the BESS. The SPECTRUM is equipped with a LUX 5K Hybrid Inverter, 14.4 kWh battery storage, 8KW solar capacity, 5kW grid export capacity and 4kW continuous emergency power supply.
  • Page 4: Safety Instructions, Labels And Warnings

    Warning of energised supplies during grid outage Shutdown procedure – refer to section 5. Rated voltages and currents marked up by the installer depending on solar panels fitted. SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 P a g e...
  • Page 5: System Configuration

    Tel: 1300 001 772 3. SYSTEM CONFIGURATION The Spectrum Power Station is made up of the following components: The Cabinet (1) is made from powder coated 3mm sheet aluminium and is suitable for installation indoors or outdoors. The Front Cover (2) can be removed via the side latches (3). The front cover can be tilted forwards for easy access to the switch panel (5) and also can be lifted off the cabinet for open access.
  • Page 6: Installation Procedure

    4.5 and Attachment A. Screw the plastic moulding back into place via 4 x screws and place a silicon bead around the edge to inhibit water ingress. SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 P a g e...
  • Page 7: Installing The Batteries

    11. Ensure the master battery (top) has dip switch setting - off/off/on/off. 12. Ensure all slave batteries have dip switch setting - off/off/off/off. SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 P a g e...
  • Page 8: Fixing The Cabinet

    Method 3 - With the batteries fitted and cabinet positioned on a stable concrete surface, the system weighs in at over 100kG and fixing points may not be necessary, especially if located in lockable area. SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 P a g e...
  • Page 9: Switch Panel Layout

    6) Inverter In (Mains) – pre-cabled to the inverter input, requires connection to the Grid supply – refer to Error! Reference source not found. 7) GPO outlet for 4G Wifi modem 8) Energy Management System (optional) SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 P a g e...
  • Page 10: Electrical Terminal Connections

    Please refer to the following section for wiring details: Error! Reference source not found.. SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 10 | P a g e...
  • Page 11: Starting Battery System

    Press the SW button for 2 Seconds only on the Top battery module (Master). Turn on Battery DC isolator on left side of the cabinet. NOTE – to restart the battery switch all batteries OFF then apply the above sequence. SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 11 |...
  • Page 12: Shut Down & Startup Procedure

     3) Turn ON Battery DC Isolator (side of cabinet)  2) Turn ON Solar DC Isolator  1) Turn ON Inverter AC IN and AC out SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 12 | P a g e...
  • Page 13: Servicing The Air Filters

    The air outlet filter is located inside the top of the front cover as per picture below, and is attached to Velcro which can be peeled off for cleaning: SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 13 |...
  • Page 14: Lux Inverter Portal And Smart Phone App

    Wi-Fi connection please note - the Smart Phone app only operates whilst the system is connected to a wifi modem which is provided by SPECTRUM as an option with all Tiny Houses, noting the cellular data plan is only active for 3 months, after which it is the customers responsibility to pay the ongoing data plan (approx.
  • Page 15: Lux Inverter - Pairing Of Wi-Fi Dongle To Router

    In order to pair the LUX Inverter to a local Wi-Fi router follow the instructions below: 1) Ensure the Customer is pre-loaded into the LUX portal – this is normally carried out by SPECTRUM prior to the installation. 2) Using a smartphone, Tablet or PC log onto the Wi-Fi dongle connected to the Inverter.
  • Page 16 It will take about 5 minutes for the Inverter to connect to the Internet. Refer to the LUX app login section to log into the LUX portal. SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 16 | P a g e...
  • Page 17: Spectrum Cabinet - Single Line Diagram

    Sealed Performance Batteries 1 Ant Road, Yatala Queensland, 4207 Tel: 1300 001 772 9. SPECTRUM CABINET - SINGLE LINE DIAGRAM SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 17 | P a g e...
  • Page 18: Warranty

    LUX Power inverter – 10 year warranty  DYNESS Battery – 10 year warranty  SPECTRUM Cabinet – 10 year warranty Individual warranty documents are attached to this manual. SPECTRUM BESS Installation Manual V2.1 – 22 Feb 23 18 |...

Table of Contents