IMPORTANT PLEASE READ All products manufactured and supplied by BAGNODESIGN are fit for purpose as long as they are Installed, used correctly, cleaned and receive regular maintenance in accordance with these instructions ... Remove all packaging and check the product for damage or missing parts before commencing with the installation.
Page 5
X=7-14 mm X=14-27 mm Assemble the parts as per the above. Ensure that the mains water supply is off before installation. Install the parts to be concealed respecting the dimensions indicated in point (1); be careful to put them aligned. Connect the hot and cold water supplies to the valves and make a pressure test to check for leaks at...