LED-Construction Light – HELFA DUO
Instruction manual
TECHNICAL SPECIFICATION
Series name
Model number
Wattage
HPF
Voltage
Frequency
Luminous Flux
Color Temperature
Color Rendering Index CRI Ra 97
IP Rating
Impact resistance rating
Power cable
Color
Material
Excellently suitable for:
-
Renovation work
-
Construction sites
-
Paintwork
Working light with a lot of lumens and high color rendering (Ra97)!
Foldable construction light for optimal illumination of rooms and work areas.
•
Super-bright, neutral white and evenly radiating light (2x 4.500 lumens).
•
DUO light head with two LED units that can be individually aligned and switched on
•
(4.500 lumen each)!
Power socket (IP54) for additional lights or for electrical appliances
•
(max. load 3.580W).
Stable, height-adjustable stand made of metal.
•
Set up and ready to use in seconds.
•
Five meter long rubber cable H07RN-F3 with safety plug.
•
The integrated cable winder also serves as a handle.
•
Including practical protective bag for easy transport.
•
Suitable for indoor and protected outdoor use.
•
Instant restart possible.
•
The operating temperature of the luminaire is -25�– +45�C.
•
CAUTIONS:
Read the entire manual carefully before installation and operation.
•
Switch OFF the power source before installation, replacement and cleaning!
•
DO NOT disassemble the inner part of the luminaire. Doing so may result in luminaire damage or malfunction.
•
Before replacement of the luminaire, turn it off and allow it to cool down.
•
The minimum safety distance from the illuminated object is 1,0m.
•
The manufacturer accepts no liability for any damage resulting from the misuse of the luminaire or when it is used
•
with inappropriate equipment.
The light source of this luminaire is not replaceable; when the light source reaches its end of life the whole luminaire
•
shall be replaced.
•
Consult your dealer if you have any enquiries.
INSTRUCTIONS FOR USE:
Place the light on a stable and dry surface.
•
Open the lower clamp lock to set up the base. Then lock the clamp lock again!
•
Now open the upper clamp lock to adjust the height of the LED light. Then lock the clamp lock again!
•
Insert the power plug into a suitable socket with protective contact. If you use the product outdoors, the power plug
•
may only be inserted into a corresponding IPX4 socket.
Now switch on the construction light using the ON/OFF switches.
•
MEGATRON
®
Pro HELFA DUO
MT69054
2 x 40W
>0,9
220-240V~
50/60Hz
2 x 4.500 Lumen (System)/2 x 5.600 Lumen (Chip)
5.000 K
IP54
IK08
5m H07RN-F3 rubber cable with safety plug
Red/Black
Plastic (PC+ABS) + Aluminium
MEGATRON
Replace any broken
Protective disk
Lieferumfang:
Including Protective bag
1,0m
----
®
© 01/2021
Need help?
Do you have a question about the Pro HELFA DUO and is the answer not in the manual?
Questions and answers