Page 1
PRINTED IN U.S.A. 2570 1199 Part No. 194119-000 Supersedes P/Ns. 192968-000/193329-000/193311-000...
Page 2
ROUGH-IN -DIMENSIONS CYCLONE XHE BTH 120 - 250 TEMPERATURE RISE - DEGREES °F - GALLONS PER HOUR Recovery capacities are based on heater performance at 94% thermal efficiency.
Page 10
FIGURE 11 VERTICAL VENT TERMINAL INSTALLATION IMPORTANT WHEN TERMINATING THROUGH A ROOF, THE FOLLOWING SPECIFICATIONS PERTAINING TO TERMINAL LOCATION MUST BE FOLLOWED. 1. Proper support must be provided for all pipe protruding through the roof. 2. The vertical roof terminations should be sealed with a plumbing roof boot or equivalent flashing.
Page 23
ONE TEMPERATURE - ONE HEATER HORIZONTAL STORAGE TANK FORCED CIRCULATION WITH OR WITHOUT BUILDING RECIRCULATION PIPE TO OPEN DRAIN INSTALL IN ACCORDANCE WITH LOCAL CODES PIPE TO OPEN DRAIN INSTALL IN ACCORDANCE WITH LOCAL CODES...
Need help?
Do you have a question about the BTH 120 - 250 and is the answer not in the manual?
Questions and answers