ROUGH-IN -DIMENSIONS CYCLONE XHE BTH 120 - 250 TEMPERATURE RISE - DEGREES °F - GALLONS PER HOUR Recovery capacities are based on heater performance at 94% thermal efficiency.
FIGURE 11 VERTICAL VENT TERMINAL INSTALLATION IMPORTANT WHEN TERMINATING THROUGH A ROOF, THE FOLLOWING SPECIFICATIONS PERTAINING TO TERMINAL LOCATION MUST BE FOLLOWED. 1. Proper support must be provided for all pipe protruding through the roof. 2. The vertical roof terminations should be sealed with a plumbing roof boot or equivalent flashing.
Page 23
ONE TEMPERATURE - ONE HEATER HORIZONTAL STORAGE TANK FORCED CIRCULATION WITH OR WITHOUT BUILDING RECIRCULATION PIPE TO OPEN DRAIN INSTALL IN ACCORDANCE WITH LOCAL CODES PIPE TO OPEN DRAIN INSTALL IN ACCORDANCE WITH LOCAL CODES...