Download Print this page

Sealey SA317.V2 Quick Start Manual page 2

Air/hydraulic nut riveter heavy-duty vacuum system

Advertisement

fig.1
4.4.
Clean air inlet filter weekly. Recommended hook-up procedure is shown in (fig.1).
4.5.
Line pressure should be increased to compensate for unusually long air hoses (over 8 metres).
4.6.
The minimum hose diameter should be 1/4" I.D., fittings must have the same inside dimensions.
4.7.
Keep hose away from heat, oil and sharp edges. Check hoses for wear, and make certain that all connections are secure.
4.8.
COUPLINGS
4.8.1.
Vibration may cause failure if a quick change coupling is connected directly to the air riveter. To overcome this, connect a leader
hose - Sealey Model No: AH2R or AH2R/38 - to the riveter. A quick change coupling may then be used to connect the leader
hose to the air line recoil hose (figs.1 & 2).
5. PREPARATION
5.1.
MANDREL CHANGE
5.1.1.
Select from M3 to M12. Lock nuts are all the same size for mandrel and anvil.
5.1.2.
Remove anvil and locknut (fig.3).
5.1.3.
Unscrew knurled cover (anticlockwise) and nose pedestal (fig.4).
5.1.4.
Push back the sliding sleeve and unscrew the mandrel (fig.5).
5.1.5.
Select required mandrel as per rivet nut size, push back sliding sleeve and screw in selected mandrel then release sliding sleeve (fig.6).
5.1.6.
Screw on knurled cover, nose pedestal, locknut and anvil.
5.2.
MANDREL PROTRUSION SETTING FOR BLIND NUT
5.2.1.
Set the length of the mandrel protruding out of the anvil, according to the blind rivet nut length. Undo the locknut and wind the anvil
in or out as required. Re-tighten the locknut.
5.2.2.
Never set the mandrel protruding length too long or too short according to the rivet nut to be set (fig.8).
fig.3
fig.5
© Jack Sealey Limited
OP
ER
fig.4
fig.6
fig.7
Original Language Version
fig.2
AT
fig.8
SA317.V2 | Issue 1 25/2/19