Advertisement

Quick Links

Para la versión en español de esta guía, vaya a vaask.com/installation-guide.
®
IN-WALL INSTALLATION GUIDE
PREMIUM HAND SANITIZING FIXTURE
ASSEMBLED IN THE USA
Original instructions (English language/U.S. version). All versions of this manual in languages other than
English are translated based on the original, capturing its substance without additions or alterations.
Patents applied for in the USA and abroad.
Model #: WMD-001 | Rev. IWIG-230713
Patent No. D970,919

Advertisement

Table of Contents
loading

Summary of Contents for Vaask WMD-001

  • Page 1 Para la versión en español de esta guía, vaya a vaask.com/installation-guide. ® IN-WALL INSTALLATION GUIDE PREMIUM HAND SANITIZING FIXTURE ASSEMBLED IN THE USA Original instructions (English language/U.S. version). All versions of this manual in languages other than English are translated based on the original, capturing its substance without additions or alterations.
  • Page 2 Children shall not play with this appliance, nor shall they clean or maintain the appliance, without supervision. To prevent accidents and machine damage, read these instructions before installation or use. For help, call +1 (512) 956-7687 or visit vaask.com.
  • Page 3: Installation

    INSTALLATION This equipment is not designed for maritime use or for use in mobile installations such as caravans or aircraft, except under certain conditions. Contact the Vaask Technical Service Department at +1 (512) 956-7687 with specific requirements. Inspect the fixture for transport damage, and do not install or use a damaged unit.
  • Page 4: Tools Needed

    DIMENSIONAL DRAWINGS AND PARTS 1 in (2.5cm) 0.7 in 9.4 in (24 cm) 1 in 11.1 in (28.3 cm) (1.8 cm) (2.5 cm) 0.6 in (1.4 cm) ATTACHMENT OPTION B HOLES FOR ATTACHMENT STUDS. USE PAN HEAD SCREWS 3.5 in ATTACHMENT OPTION A (8.89 cm) FLAGS FOR RETENTION...
  • Page 5: What's Included In The Box

    WHAT’S INCLUDED IN THE BOX Façade clip screw Firmware update port Pump tube Junction box Stored in box: Snap-to-fit Door harness connector Nozzle tube Pump Enclosure Control buttons Power switch Refill cap Door Refillable 2.0L sanitizer tank Tank Slam latch release button Dip tube cap Slam latch...
  • Page 6 CHOOSING YOUR INSTALLATION LOCATION min 3.5 in (8.9 cm) 100–220V 0.25A min 9.6 in (24.4 cm) • Power to the desired location must be 100 to 220V single-phase AC, 0.25 amp, or Power over Ethernet that meets standards 802.3af or 802.3at. •...
  • Page 7 For Power over Ethernet: Run a PoE cable from your Ethernet power sourcing equipment to the installation wall cavity. NOTE: If you are running power for a Vaask unit that will not be installed until after the building is occupied, stop here. When the unit arrives, proceed to page 8.
  • Page 8: Cut The Hole

    STEP 4: Using tape, attach the enclosed 9.6 in codes. (24.4 cm) x 14.5 in (36.8 cm) template to the wall where you want to place the Vaask fixture. Use a bubble level to ensure that it is level. 9.6 in (24.4 cm)
  • Page 9: Continued On Next Page

    STEP 7: Carefully cut out the drawn rectangle template with a pencil. with a rotary saw or oscillating tool. STEP 8: Test how the Vaask unit fits in the cutout hole to ensure proper fit. Adjust if needed. STEP 6: If the wall surface is already painted, protect the paint by taping to the outside of the drawn line with painter’s tape.
  • Page 10 STEP 9: Carefully remove painter’s tape. | 10...
  • Page 11 COMPLETE ELECTRICAL INSTALLATION Attach the AC electrical power to the Vaask fixture’s power wires using the included Ensure that power to the WAGO connectors within the junction box installation site is turned off at the as per national electric code to maintain breaker box and locked out.
  • Page 12: Specifications

    STEP 10, OPTION B: POWER OVER ETHERNET For Vaask units with a Power over Ethernet power supply: Rest the Vaask unit on the bottom edge of the wall cutout, then insert the PoE cable into the jack in the top of the unit.
  • Page 13 MOUNT IN A STUD WALL WITH DRYWALL FAÇADE STEP 11: Insert the top of the unit into STEP 13: For AC power: Turn supply circuit the cutout carefully so that the cord or power back on. conduit does not snag on the cutout. STEP 14: Flip the power switch on [-].
  • Page 14: Quick Start

    QUICK START STEP 15: With the empty tank still STEP 17: Unscrew the refill cap on top of attached, press the middle button inside the refillable tank. the door to remove residual sanitizer from the tubing. STEP 16: When the light on the front of STEP 18: Fill the tank to the desired fill the door turns yellow, unplug the tank by level with hand sanitizer gel made of 60%...
  • Page 15 STEP 19: Put the refill cap back on the STEP 21: Press the middle button inside tank and hand-tighten. the door to prime Vaask. STEP 22: Once the light on the front panel stops blinking, place your hand within 4 inches of the dispensing nozzle...
  • Page 16: Return Policy

    APPEARANCE PACKAGE, SALE IS FINAL AND NON-REFUNDABLE. • Customer must notify Vaask of the return within 45 calendar days of the ship date, as set forth by Vaask in its sole and absolute discretion. The customer must ship product back within 10 business days of receiving he Return Material Authorization.
  • Page 17: Warranty Policy

    5-YEAR LIMITED PRODUCT WARRANTY Where Vaask, LLC (“Vaask,” “we” or “us”) has identified in or on product packaging or in a product website description that a Vaask-branded hand sanitizing fixture has a 5-Year Limited Product Warranty (a “Qualifying Product”), then for that Qualifying Product, Vaask warrants...
  • Page 18 (following our provided instructions) or schedule a repair appointment for Vaask or one of our authorized service providers to conduct the repairs at the customer’s location. If we are unable to diagnose the problem remotely, or if we otherwise determine that replacement of the product is necessary, we will ship a replacement product free of charge.

This manual is also suitable for:

Iwig-230713

Table of Contents